Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall surface, additionally called usual wall surface or as a demising wall) is a splitting dividers in between 2 adjoining structures that is shared by the owners of each house or organization. Typically, the home builder lays the wall surface along a residential property line separating 2 terraced homes, so that one half of the wall’s density lies on each side. This sort of wall surface is normally architectural. Celebration wall surfaces can likewise be created by 2 abutting wall surfaces constructed at various times. The term can be additionally used to describe a department between separate devices within a multi-unit apartment building. Extremely typically the wall in this situation is non-structural but designed to meet established standards for noise and/or fire security, i.e. a firewall program.

party wall

The Party Wall Act 1996

as it impacts the garden

At first sight, it is simple to believe that the 1996 Party Wall Act does not impact garden construction, nevertheless it does affect the construction of border walls even if not part of structures and can also applies to deep excavations.

The Party Wall Act 1996 entered into force in 1997, so it is now law and gives you rights and responsibilities whichever the side of the ‘wall’ you are on i.e. whether you are planning/doing work on a relevant structure or if your neighbour is.

The Party Wall Act does not apply to boundary fences.

The Party Wall Act does not impact any requirement for Planning Authorization for any work carried out. Likewise, having Preparation Authorization does not negate the requirements under the Party Wall Act.

The Party Wall Act enters into effect if someone is planning to do work on an appropriate structure, for the functions of the Act ‘party wall’ does not just suggest the wall in between two semi-detached properties, as far as garden enthusiasts are concerned it covers:

For information of how the Party Wall Act impacts structure operate in general, take a look at this page.

Just like all work affecting neighbours, it is constantly better to reach a friendly arrangement rather than resort to any law. Even where the work needs a notice to be served, it is much better to informally discuss the intended work, think about the neighbours remarks, and modify your plans (if appropriate) before serving the notification.

What garden work needs a notification and permission.

The basic principle of the Party Wall Act is that all work which might have an effect upon the structural strength or support function of the party wall or may cause damage to the neighbouring side of the wall need to be informed. If in doubt, advice ought to be sought from a regional Building Control Workplace or professional surveyor/architect.

Operate in the garden covered by the Party Wall Act include:

Boundary walls

If the planned work on a limit wall falls under the Party Wall Act, a notice must be provided to all impacted neighbouring parties. The notification must include (see sample letters in Part 5 of the Party Wall leaflet):.

If the planned work is a new limit wall approximately or astride the border line the process of serving a notice under the Party Wall Act is as follows:.

See below concerning what occurs in the event of a dispute/objection.

Excavations.

If the prepared work is an excavation within the distance/depth covered by the Party Wall Act, the notice needs to be served a minimum of one month prior to the prepared start day of the work. Neighbouring celebrations need to give written contract within 14 days or a disagreement is considered to have taken place.

See below regarding what takes place in the event of a dispute/objection.

What takes place if a disagreement arises.

If agreement can not be reached between neighbouring celebrations, the procedure is as follows:.

When you have agreement.

Once you have agreement, all work must adhere to the notice. All the contracts must be kept to guarantee that a record of the granted permission is kept; a subsequent buyer of the home may want to develop that the work was performed in accordance with the Party Wall Act requirements.

Remember: