Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is a making it possible for Act, insofar as it gives the owner of a home the legal right to carry out particular works that might otherwise constitute trespass or problem.

It also looks for to secure the interests of adjoining owners from any possibly adverse impacts that such works might have by imposing a requirement that all adjoining owners be offered prior notice of them.

In addition, the Act provides for a compulsory disagreement resolution treatment mediated by a statutorily appointed surveyor or surveyors if neighbouring owners have concerns about the application of any proposal so informed.

Specifically, such notification should be served where the owner of a property (referred to as ‘the structure owner’) intends to carry out any construction work described in Sections 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is restricted to the following:

The details that Observes must offer in respect of works covered the above sections is different in each case. The requirements of Area 1 and Area 6 Notifications are set out in those areas however the requirements of a Notice connecting to Area 2 works is set out in Area 3 of the Act. It is essential to note that the validity of any notice not providing all the appropriate details or served in the incorrect manner, could be available to challenge in Court.

There is no standard form of Notice although lots of people utilize those released by the RICS or variations appended to the explanatory pamphlet released by the Department for Communities and Local Government. Offered all the info required by the pertinent section of the Act is present, a basic letter would be similarly legitimate.

Depending upon the situations of any provided project there may be more than one adjoining owner on whom discover requirements to be served in respect of the same work and, in the case of deep excavations, an Adjacent Owner may be aside from an instant neighbour. It is constantly preferable to go over the designated works with adjoining owners before serving them with official composed notification – a proposition well described may relieve issues enough to prevent a dispute emerging and prevent the requirement to select property surveyors.

There are 2 exceptions where the need to serve notice might be prevented:

  1. De minimis works: The government’s explanatory booklet states that some deal with a party wall might be so small that service of notification under the Act would be usually considered not needed and give as examples works unlikely to impact the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support racks, cooking area cupboards, and so on.
  2. Works under Area 2 of the Act offered that composed consent is obtained from all Adjacent Owners and Occupiers before work commences.

The three types of Notice are understood, respectively as:

A party structure notice must be served at least 2 months before the date on which it is proposed to start that work. The other 2 notifications must be served a minimum of one month prior to work starting.

The obligatory info which Observes need to include are as follows:

Most of the pro-forma notifications in use include the following info as a matter of course no matter the type of notification:

Section 10 of the Act states that where an adjoining owner does not consent in writing to works informed by the structure owner under Sections 3 and 6, both celebrations must either agree on the consultation of a single property surveyor to act for both of them (referred to as the Agreed Property Surveyor), or each appoint their own property surveyor, to figure out by award matters in dispute between the celebrations.

Where a task is straightforward, this might just include factor to consider of the time and manner in which those works are to be performed. In more complex plans, believed will have to be given to a commensurately greater number of factors and undoubtedly selected surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The very same treatment is utilized to deal with any subsequent disagreements between neighbouring owners that may develop in relation to the informed works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory procedure. A dispute can develop by an adjacent owner actively dissenting, that is, interacting to the structure owner an objection in respect of some matter occurring out of or incidental to the works – the ways of making that objection are not important, however if he stays silent, neither dissenting nor consenting for a period of 2 week after having been served with a Notice under either Area 3 or Section 6, the Act deems a dissent to have occurred in any event.

There is no deemed dissent arrangement in Area 1 of the Act. A valid dispute can still emerge, and property surveyors be selected in accordance with Section 10, in regard of works informed under that section however just as concerns real dissent on particular grounds. An adjacent owner’s reasons for disputing Section 2 and Section 6 works are rarely defined prior to the visit of surveyors and in most cases not even then.

Where dissent has emerged, whether actual or considered, both owners are legally obliged to appoint a concurred surveyor or, if they can not jointly settle on a single person, a surveyor each and if asked for to make such a consultation by the other party, must do so within 10 days of the demand being served. Failure to comply, automatically gives the owner making the request the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two property surveyors are designated, they are required to agree upon the selection, in composing, of a third property surveyor who might be called upon by either of the surveyors or either of the parties to figure out the challenged matters and make the essential award. The third property surveyor is never appointed by anybody but the Act gives the individual so selected the same statutory powers as the two property surveyors.

3rd surveyors are most frequently called upon where the two surveyors have actually reached an impasse in their considerations over some particular point and often this can be in regard on the reasonableness of the fees of the surveyor designated by the adjacent owner. Seldom will a third surveyor be asked to prepare an award in regard of the entire works but might join with one or other of the two surveyors to do so if the requirement occurs.

There is no definition of who can be a surveyor, but it must not be the same person that will supervise the works.

The award will set out the works that can be carried out, who will pay the costs for the preparation of the award and inspection of the works to ensure that they comply with the works, and who will pay for the works. If the work is exclusively for the benefit of the structure owner, then they will usually be needed to pay the charges and the expense of the works.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act enables access to the adjacent property for the functions of performing the works whether the adjacent owner permits or not, nevertheless they must be offered 2 week notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other documents can be served by electronic communications.

The details that Notices must provide in regard of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. A legitimate dispute can still occur, and surveyors be appointed in accordance with Area 10, in regard of works informed under that area but only as concerns actual dissent on particular premises. An adjacent owner’s factors for challenging Section 2 and Area 6 works are hardly ever specified prior to the visit of property surveyors and in many cases not even then.

Where dissent has arisen, whether real or deemed, both owners are lawfully required to designate a concurred property surveyor or, if they can not collectively agree on a single individual, a surveyor each and if asked for to make such a consultation by the other party, need to do so within 10 days of the demand being served.