What is a Party Wall Award?

The process and requirements of a Party Wall Award are as set out in the Party Wall etc. Act 1996. A Party Wall Award is an arrangement made in between a minimum of 2 neighbouring occupiers prior to the beginning of construction/building work which is to be undertaken to a party limit or structure, or where works are being carried out in close proximity to a party border or structure. There are three main types of work which require a Party Wall Property surveyor to conduct a Party Wall Award and these are:

  • Line of junction (developing a new wall on or along with a limit).
  • Party Structure Functions (works to an existing party wall such as cutting into, reconstructing, thickening etc.).
  • Adjacent Excavation (excavations to a lower level within either 3m or 6m of an existing structure).

In London and across the UK, our skilled commercial building surveyors perform a variety of professional surveying services consisting of Party Wall Surveys (Party Wall Awards). At Commercial Building Surveyors we perform Party Wall Surveys by experienced and professional Party Wall Surveyors throughout the UK.

Party Wall (WikiPedia)

A party wall (periodically parti-wall or parting wall, likewise recognized as common wall or as a demising wall) is a dividing partition between two adjacent buildings that is shared by the occupants of each home or service. Usually, the home builder lays the wall surface along a residential property line separating 2 terraced residences, so that one fifty percent of the wall’s density rests on each side. This sort of wall is normally architectural. Party walls can additionally be created by two abutting wall surfaces developed at different times. The term can be also made use of to explain a division between different devices within a multi-unit apartment building. Extremely often the wall in this instance is non-structural yet created to satisfy well-known criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an allowing Act, insofar as it approves the owner of a residential or commercial property the legal right to carry out particular works that may otherwise make up trespass or nuisance.

Nevertheless, it also seeks to protect the interests of adjoining owners from any potentially unfavorable impacts that such works may have by imposing a requirement that all adjacent owners be offered prior notification of them.

In addition, the Act provides for a compulsory dispute resolution procedure moderated by a statutorily appointed surveyor or property surveyors if neighbouring owners have issues about the implementation of any proposition so alerted.

Particularly, such notification must be served where the owner of a home (referred to as ‘the structure owner’) intends to carry out any building and construction work explained in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is limited to the following:

The details that Discovers need to offer in regard of works covered the above sections is various in each case. The requirements of Area 1 and Area 6 Notices are set out in those sections but the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. It is necessary to keep in mind that the credibility of any notification not supplying all the relevant details or served in the incorrect way, could be open up to challenge in Court.

There is no standard kind of Notice although many individuals utilize those released by the RICS or versions added to the explanatory booklet released by the Department for Communities and Local Government. However, supplied all the information required by the pertinent section of the Act exists, a basic letter would be similarly legitimate.

Depending on the circumstances of any offered task there might be more than one adjacent owner on whom see requirements to be served in respect of the very same work and, in the case of deep excavations, an Adjoining Owner may be besides an immediate neighbour. It is constantly preferable to talk about the desired works with adjoining owners prior to serving them with official composed notification – a proposition well discussed may reduce concerns adequate to prevent a dispute arising and avoid the requirement to appoint surveyors.

There are two exceptions where the need to serve notice might be avoided:

  1. De minimis works: The federal government’s explanatory pamphlet states that some works on a party wall might be so minor that service of notice under the Act would be typically considered as not required and give as examples works unlikely to affect the structural strength or support functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support racks, cooking area cabinets, and the like.
  2. Functions under Section 2 of the Act offered that written consent is gotten from all Adjoining Owners and Occupiers before work commences.

The three types of Notification are known, respectively as:

A party structure notice need to be served at least two months prior to the date on which it is proposed to start that work. The other 2 notices must be served at least one month prior to work commencing.

The obligatory info which Observes need to include are as follows:

The majority of the pro-forma notices in use include the following details as a matter of course no matter the type of notice:

Area 10 of the Act stipulates that where an adjoining owner does not permission in writing to works informed by the building owner under Sections 3 and 6, both celebrations need to either agree on the consultation of a single property surveyor to act for both of them (referred to as the Agreed Surveyor), or each appoint their own property surveyor, to determine by award matters in dispute between the celebrations.

Where a task is straightforward, this may just involve consideration of the time and way in which those works are to be carried out. In more complex schemes, believed will have to be provided to a commensurately greater number of aspects and certainly designated surveyors have the statutory jurisdiction to make an award in regard of any matter gotten in touch with any work to which the act relates.

The same procedure is utilized to fix any subsequent disputes between neighbouring owners that may develop in relation to the alerted works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not stop the statutory process. A disagreement can develop by an adjacent owner actively dissenting, that is, communicating to the structure owner an objection in regard of some matter arising out of or incidental to the works – the means of making that objection are not important, but if he stays silent, neither dissenting nor consenting for a duration of 14 days after having actually been served with a Notice under either Area 3 or Section 6, the Act deems a dissent to have arisen in any event.

There is no deemed dissent provision in Section 1 of the Act. A legitimate conflict can still emerge, and surveyors be selected in accordance with Area 10, in regard of works informed under that area however just as concerns real dissent on particular premises. An adjoining owner’s factors for contesting Section 2 and Area 6 works are hardly ever specified prior to the consultation of surveyors and in a lot of cases not even then.

Where dissent has actually occurred, whether real or deemed, both owners are legally required to designate a concurred property surveyor or, if they can not jointly settle on a bachelor, a surveyor each and if asked for to make such a visit by the other party, must do so within 10 days of the request being served. Failure to comply, immediately offers the owner making the request the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two property surveyors are designated, they are required to agree upon the selection, in composing, of a third surveyor who might be hired by either of the property surveyors or either of the parties to identify the contested matters and make the essential award. The third property surveyor is never designated by anybody however the Act offers the individual so picked the very same statutory powers as the two property surveyors.

Third surveyors are most commonly hired where the two surveyors have reached an impasse in their deliberations over some specific point and often this can be in regard on the reasonableness of the costs of the property surveyor designated by the adjoining owner. Hardly ever will a third property surveyor be asked to prepare an award in respect of the entire works but might join with one or other of the two surveyors to do so if the need arises.

There is no definition of who can be a surveyor, however it should not be the same individual that will monitor the works.

The award will set out the works that can be carried out, who will pay the charges for the preparation of the award and assessment of the works to guarantee that they comply with the works, and who will pay for the works. They will normally be needed to pay the charges and the cost of the works if the work is solely for the advantage of the building owner.

Celebrations have 2 week to appeal to the county court if they disagree with the award.

The Act permits access to the adjoining home for the purposes of performing the works whether the adjoining owner permits or not, nevertheless they should be given 2 week notification.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notices and other files can be served by electronic interactions.

The information that Notices need to supply in respect of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. A valid dispute can still emerge, and property surveyors be selected in accordance with Area 10, in respect of works informed under that area however just as concerns real dissent on specific premises. An adjoining owner’s reasons for challenging Area 2 and Section 6 works are seldom defined prior to the appointment of property surveyors and in numerous cases not even then.

Where dissent has developed, whether real or deemed, both owners are lawfully required to select a concurred property surveyor or, if they can not jointly agree on a single individual, a property surveyor each and if asked for to make such an appointment by the other party, must do so within 10 days of the request being served.