The Faulkners Surveyors is an expert Chartered Building Surveying Practice that operates throughout UK. The Faulkners Surveyors carries out all aspects of the Party Wall etc. Act 1996 and provides the following services:

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an allowing Act, insofar as it approves the owner of a property the legal right to undertake certain works that may otherwise make up trespass or annoyance.

It also seeks to safeguard the interests of adjoining owners from any potentially adverse impacts that such works may have by imposing a requirement that all adjoining owners be offered prior notification of them.

In addition, the Act attends to a mandatory dispute resolution treatment moderated by a statutorily appointed property surveyor or surveyors if neighbouring owners have concerns about the execution of any proposition so notified.

Specifically, such notification must be served where the owner of a residential or commercial property (referred to as ‘the structure owner’) plans to carry out any building and construction work described in Areas 1, 2 and 6 of the Act. Keep in mind that it is just those works that are covered by the Act and the scope is restricted to the following:

The info that Discovers must supply in respect of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those sections but the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. It is important to keep in mind that the validity of any notice not providing all the pertinent info or served in the incorrect manner, could be open to challenge in Court.

There is no standard type of Notice although many people utilize those published by the RICS or versions added to the explanatory brochure provided by the Department for Communities and Local Government. Provided all the info required by the pertinent section of the Act is present, a basic letter would be equally valid.

Depending on the situations of any offered task there may be more than one adjacent owner on whom see requirements to be served in regard of the exact same work and, when it comes to deep excavations, an Adjacent Owner might be other than an instant neighbour. It is constantly more suitable to discuss the intended works with adjoining owners prior to serving them with official written notice – a proposal well described might minimize issues enough to prevent a dispute arising and prevent the requirement to select property surveyors.

There are two exceptions where the need to serve notice may be avoided:

  1. De minimis works: The federal government’s explanatory booklet says that some works on a party wall may be so minor that service of notice under the Act would be typically regarded as not essential and give as examples works unlikely to impact the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support racks, kitchen area cupboards, and the like.
  2. Works under Area 2 of the Act provided that composed approval is gotten from all Adjoining Owners and Occupiers prior to work commences.

The 3 kinds of Notice are understood, respectively as:

A party structure notification need to be served a minimum of two months prior to the date on which it is proposed to begin that work. The other two notices should be served a minimum of one month prior to work commencing.

The necessary information which Sees need to contain are as follows:

The majority of the pro-forma notifications in use consist of the following information as a matter of course no matter the type of notification:

Section 10 of the Act stipulates that where an adjoining owner does not authorization in writing to works alerted by the structure owner under Areas 3 and 6, both parties must either settle on the visit of a single surveyor to act for both of them (known as the Agreed Property Surveyor), or each appoint their own property surveyor, to determine by award matters in dispute between the parties.

Where a project is straightforward, this might just include consideration of the time and manner in which those works are to be performed. In more complex plans, thought will need to be provided to a commensurately greater number of aspects and undoubtedly designated property surveyors have the statutory jurisdiction to make an award in regard of any matter gotten in touch with any work to which the act relates.

The exact same procedure is utilized to fix any subsequent conflicts between neighbouring owners that might develop in relation to the alerted works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory procedure. A conflict can occur by an adjacent owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter emerging out of or incidental to the works – the ways of making that objection are trivial, however if he remains quiet, neither consenting nor dissenting for a duration of 14 days after having actually been served with a Notice under either Section 3 or Area 6, the Act considers a dissent to have actually arisen in any event.

There is no deemed dissent provision in Section 1 of the Act. A legitimate dispute can still arise, and property surveyors be designated in accordance with Section 10, in respect of works alerted under that section but only as regards real dissent on specific premises. An adjacent owner’s factors for disputing Area 2 and Section 6 works are hardly ever specified prior to the appointment of surveyors and in many cases not even then.

Where dissent has developed, whether real or deemed, both owners are lawfully obliged to designate a concurred property surveyor or, if they can not collectively agree on a bachelor, a property surveyor each and if requested to make such a visit by the other party, must do so within 10 days of the demand being served. Failure to comply, immediately gives the owner making the request the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where 2 surveyors are selected, they are required to agree upon the choice, in composing, of a 3rd property surveyor who might be hired by either of the surveyors or either of the celebrations to identify the contested matters and make the essential award. The third property surveyor is never designated by anyone however the Act provides the individual so chose the same statutory powers as the two surveyors.

Third property surveyors are most frequently hired where the two surveyors have actually reached a deadlock in their considerations over some particular point and often this can be in regard on the reasonableness of the fees of the surveyor appointed by the adjoining owner. Rarely will a third surveyor be asked to prepare an award in regard of the whole works but might accompany one or other of the two surveyors to do so if the need occurs.

There is no definition of who can be a surveyor, but it must not be the same person that will supervise the works.

The award will set out the works that can be performed, who will pay the costs for the preparation of the award and assessment of the works to make sure that they abide by the works, and who will spend for the works. They will usually be required to pay the costs and the cost of the works if the work is entirely for the benefit of the building owner.

Celebrations have 14 days to attract the county court if they disagree with the award.

The Act enables access to the adjacent home for the purposes of carrying out the works whether the adjoining owner permits or not, nevertheless they must be provided 2 week notification.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other files can be served by electronic interactions.

The details that Discovers need to supply in regard of works covered the above areas is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. A valid dispute can still occur, and property surveyors be selected in accordance with Section 10, in regard of works notified under that section however just as concerns actual dissent on particular premises. An adjacent owner’s factors for challenging Area 2 and Section 6 works are rarely specified prior to the visit of surveyors and in lots of cases not even then.

Where dissent has actually arisen, whether real or deemed, both owners are lawfully obliged to appoint a concurred property surveyor or, if they can not jointly concur on a single individual, a property surveyor each and if asked for to make such an appointment by the other party, need to do so within 10 days of the request being served.