The Faulkners Surveyors is a specialist Chartered Building Surveying Practice that operates throughout UK. The Faulkners Surveyors carries out all aspects of the Party Wall and so on. Act 1996 and provides the following services:

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an allowing Act, insofar as it gives the owner of a property the legal right to carry out specific works that may otherwise make up trespass or annoyance.

It also looks for to safeguard the interests of adjoining owners from any possibly unfavorable results that such works might have by imposing a requirement that all adjoining owners be offered prior notification of them.

In addition, the Act provides for a compulsory disagreement resolution treatment moderated by a statutorily appointed property surveyor or property surveyors if neighbouring owners have issues about the execution of any proposal so informed.

Particularly, such notification should be served where the owner of a residential or commercial property (known as ‘the building owner’) plans to undertake any building and construction work described in Areas 1, 2 and 6 of the Act. Keep in mind that it is just those works that are covered by the Act and the scope is restricted to the following:

The details that Observes need to offer in respect of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those sections however the requirements of a Notice connecting to Area 2 works is set out in Area 3 of the Act. It is very important to note that the credibility of any notification not offering all the relevant information or served in the incorrect manner, could be available to challenge in Court.

There is no standard form of Notification although many individuals use those published by the RICS or variations added to the explanatory brochure provided by the Department for Communities and Local Government. Supplied all the information needed by the pertinent section of the Act is present, an easy letter would be equally valid.

Depending on the circumstances of any provided job there might be more than one adjoining owner on whom observe needs to be served in regard of the same work and, in the case of deep excavations, an Adjacent Owner might be besides an immediate neighbour. It is constantly more suitable to go over the desired deal with adjoining owners before serving them with official written notification – a proposal well discussed may alleviate issues adequate to prevent a conflict emerging and avoid the need to designate surveyors.

There are two exceptions where the need to serve notice may be prevented:

  1. De minimis works: The government’s explanatory booklet says that some deal with a party wall may be so minor that service of notice under the Act would be generally considered not essential and give as examples works not likely to impact the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support racks, cooking area cupboards, and the like.
  2. Functions under Section 2 of the Act offered that written permission is obtained from all Adjacent Owners and Occupiers before work commences.

The three kinds of Notice are understood, respectively as:

A party structure notice need to be served a minimum of two months before the date on which it is proposed to begin that work. The other 2 notifications must be served a minimum of one month prior to work beginning.

The necessary details which Sees must consist of are as follows:

Most of the pro-forma notices in use consist of the following details as a matter of course despite the kind of notification:

Section 10 of the Act specifies that where an adjoining owner does not approval in writing to works notified by the building owner under Areas 3 and 6, both celebrations need to either settle on the visit of a single property surveyor to act for both of them (referred to as the Agreed Surveyor), or each appoint their own property surveyor, to identify by award matters in dispute between the parties.

Where a task is straightforward, this may just involve consideration of the time and manner in which those works are to be performed. In more complex schemes, believed will need to be given to a commensurately greater number of elements and certainly appointed property surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The same procedure is utilized to solve any subsequent disagreements between neighbouring owners that may occur in relation to the notified works, consisting of any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory process. A disagreement can emerge by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in respect of some matter developing out of or incidental to the works – the means of making that objection are not important, but if he stays silent, neither dissenting nor consenting for a duration of 2 week after having been served with a Notice under either Area 3 or Section 6, the Act deems a dissent to have arisen in any event.

There is no deemed dissent arrangement in Section 1 of the Act. A legitimate conflict can still develop, and surveyors be appointed in accordance with Section 10, in regard of works alerted under that section but just as relates to real dissent on particular premises. An adjacent owner’s factors for contesting Area 2 and Area 6 works are hardly ever specified prior to the visit of property surveyors and in most cases not even then.

Where dissent has actually occurred, whether real or considered, both owners are legally required to appoint an agreed property surveyor or, if they can not jointly agree on a single person, a surveyor each and if requested to make such a consultation by the other party, should do so within 10 days of the demand being served. Failure to comply, immediately provides the owner making the demand the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where 2 surveyors are appointed, they are obliged to agree upon the choice, in composing, of a third surveyor who may be hired by either of the surveyors or either of the parties to determine the contested matters and make the required award. The third property surveyor is never selected by anyone but the Act provides the individual so chose the very same statutory powers as the two property surveyors.

Third surveyors are most commonly hired where the two property surveyors have actually reached an impasse in their considerations over some specific point and often this can be in respect on the reasonableness of the fees of the surveyor designated by the adjoining owner. Hardly ever will a third property surveyor be asked to draw up an award in regard of the entire works but may join with one or other of the two property surveyors to do so if the need develops.

There is no meaning of who can be a surveyor, however it ought to not be the same individual that will monitor the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and evaluation of the works to make sure that they abide by the works, and who will spend for the works. If the work is solely for the benefit of the structure owner, then they will usually be required to pay the costs and the expense of the works.

Parties have 14 days to interest the county court if they disagree with the award.

The Act enables access to the adjoining residential or commercial property for the functions of performing the works whether the adjoining owner permits or not, nevertheless they need to be given 14 days notice.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notices and other files can be served by electronic communications.

The info that Observes should provide in regard of works covered the above sections is various in each case. The requirements of Section 1 and Area 6 Notifications are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Area 3 of the Act. A legitimate dispute can still occur, and surveyors be designated in accordance with Section 10, in respect of works alerted under that area but just as relates to real dissent on specific premises. An adjoining owner’s reasons for disputing Section 2 and Area 6 works are hardly ever defined prior to the appointment of surveyors and in many cases not even then.

Where dissent has occurred, whether real or considered, both owners are lawfully obliged to appoint an agreed property surveyor or, if they can not collectively agree on a single individual, a surveyor each and if asked for to make such an appointment by the other party, should do so within 10 days of the demand being served.