We are fully certified expert Party Wall Surveyors with years of experience producing Arrange of Condition reports and legally serving Party Wall Agreements and Notices.

With offices in Central, South and North London it makes us perfectly positioned to serve Greater London and the surrounding counties.

Whether you’re a Structure Owner planning a brand-new project or a neighbour who has been served a Party Wall Notification our knowledge and experience ensures we are constantly best prepared to assist with your Party Wall requirements.

Call now and talk to a Specialist Surveyor for friendly expert recommendations.

Party Wall (WikiPedia)

Commonly, the builder lays the wall along a building line separating 2 terraced homes, so that one half of the wall’s thickness lies on each side. This kind of wall is usually architectural. Celebration walls can also be created by 2 abutting walls built at different times.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it gives the owner of a property the legal right to carry out certain works that may otherwise constitute trespass or nuisance.

However, it likewise looks for to safeguard the interests of adjoining owners from any potentially unfavorable impacts that such works might have by imposing a requirement that all adjoining owners be offered prior notice of them.

In addition, the Act attends to an obligatory dispute resolution procedure mediated by a statutorily selected surveyor or property surveyors if neighbouring owners have issues about the execution of any proposal so notified.

Particularly, such notice needs to be served where the owner of a residential or commercial property (called ‘the structure owner’) means to carry out any construction work described in Areas 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is restricted to the following:

The information that Notices should provide in respect of works covered the above areas is various in each case. The requirements of Area 1 and Section 6 Notifications are set out in those sections but the requirements of a Notification connecting to Area 2 works is set out in Area 3 of the Act. It is very important to keep in mind that the credibility of any notice not offering all the appropriate details or served in the incorrect manner, could be open to challenge in Court.

There is no standard kind of Notice although many individuals utilize those released by the RICS or versions added to the explanatory booklet released by the Department for Communities and Local Government. Provided all the details needed by the relevant section of the Act is present, an easy letter would be equally valid.

Depending upon the scenarios of any provided project there may be more than one adjacent owner on whom notice needs to be served in respect of the exact same work and, when it comes to deep excavations, an Adjacent Owner might be other than an immediate neighbour. It is constantly preferable to discuss the designated works with adjoining owners prior to serving them with official written notification – a proposal well described might relieve concerns sufficient to prevent a disagreement emerging and avoid the necessity to appoint surveyors.

There are 2 exceptions where the requirement to serve notice might be avoided:

  1. De minimis works: The federal government’s explanatory pamphlet states that some deal with a party wall may be so minor that service of notice under the Act would be normally regarded as not essential and give as examples works unlikely to affect the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support shelves, kitchen area cupboards, and so on.
  2. Works under Section 2 of the Act offered that composed consent is gotten from all Adjacent Owners and Occupiers prior to work commences.

The three kinds of Notification are understood, respectively as:

A party structure notification need to be served at least 2 months before the date on which it is proposed to start that work. The other two notices must be served a minimum of one month prior to work commencing.

The mandatory info which Observes need to include are as follows:

The majority of the pro-forma notices in use include the following information as a matter of course regardless of the kind of notice:

Section 10 of the Act stipulates that where an adjoining owner does not consent in writing to works informed by the building owner under Areas 3 and 6, both parties need to either settle on the visit of a single surveyor to act for both of them (known as the Agreed Surveyor), or each designate their own surveyor, to determine by award matters in dispute in between the parties.

Where a job is straightforward, this may just involve factor to consider of the time and manner in which those works are to be carried out. In more complex schemes, believed will need to be offered to a commensurately greater number of factors and undoubtedly designated surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The very same treatment is utilized to fix any subsequent disagreements between neighbouring owners that might arise in relation to the informed works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjacent owner does not halt the statutory procedure. A conflict can develop by an adjoining owner actively dissenting, that is, interacting to the structure owner an objection in respect of some matter occurring out of or incidental to the works – the means of making that objection are not important, but if he remains silent, neither dissenting nor consenting for a duration of 2 week after having been served with a Notification under either Section 3 or Area 6, the Act considers a dissent to have arisen in any event.

There is no considered dissent provision in Area 1 of the Act. A valid conflict can still arise, and surveyors be appointed in accordance with Section 10, in regard of works informed under that section however just as regards real dissent on specific premises. An adjoining owner’s factors for disputing Area 2 and Section 6 works are rarely defined prior to the visit of surveyors and oftentimes not even then.

Where dissent has emerged, whether real or considered, both owners are legally obliged to select a concurred surveyor or, if they can not jointly settle on a single person, a property surveyor each and if requested to make such an appointment by the other party, should do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the demand the statutory authority to select a surveyor on behalf of the recalcitrant party. This procedure is set out in area 10( 4) of the Act.

Where two property surveyors are selected, they are obliged to agree upon the selection, in composing, of a 3rd property surveyor who may be called upon by either of the surveyors or either of the parties to identify the contested matters and make the required award. The third surveyor is never ever designated by anyone however the Act gives the individual so chose the same statutory powers as the two property surveyors.

Third surveyors are most frequently hired where the two property surveyors have reached an impasse in their deliberations over some specific point and frequently this can be in regard on the reasonableness of the charges of the property surveyor designated by the adjacent owner. Rarely will a 3rd surveyor be asked to prepare an award in regard of the entire works but might join with one or other of the two surveyors to do so if the requirement emerges.

There is no meaning of who can be a property surveyor, however it must not be the same person that will supervise the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and assessment of the works to guarantee that they adhere to the works, and who will spend for the works. They will usually be needed to pay the costs and the expense of the works if the work is exclusively for the advantage of the structure owner.

If they disagree with the award, celebrations have 14 days to appeal to the county court.

The Act allows access to the adjoining property for the functions of carrying out the works whether the adjacent owner gives permission or not, nevertheless they must be provided 2 week notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notices and other documents can be served by electronic communications.

The details that Discovers need to provide in respect of works covered the above areas is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those sections but the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. A legitimate dispute can still emerge, and property surveyors be selected in accordance with Section 10, in respect of works notified under that area however only as relates to real dissent on specific premises. An adjacent owner’s reasons for disputing Section 2 and Area 6 works are seldom defined prior to the consultation of property surveyors and in numerous cases not even then.

Where dissent has developed, whether actual or considered, both owners are legally required to designate a concurred property surveyor or, if they can not collectively concur on a single person, a property surveyor each and if asked for to make such an appointment by the other party, should do so within 10 days of the request being served.

Related Articles

Around the Web