We are completely certified expert Party Wall Surveyors with years of experience producing Schedule of Condition reports and lawfully serving Party Wall Agreements and Notices.

With offices in Central, South and North London it makes us perfectly put to serve Greater London and the surrounding counties.

Whether you’re a Structure Owner preparing a brand-new task or a neighbour who has been served a Party Wall Notification our knowledge and experience ensures we are always best prepared to assist with your Party Wall requirements.

Call now and speak with a Specialist Surveyor for friendly professional guidance.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it grants the owner of a home the legal right to undertake particular works that might otherwise make up trespass or nuisance.

However, it also seeks to protect the interests of adjacent owners from any possibly unfavorable results that such works may have by enforcing a requirement that all adjoining owners be provided prior notification of them.

In addition, the Act offers a necessary dispute resolution procedure mediated by a statutorily designated property surveyor or surveyors if neighbouring owners have issues about the implementation of any proposal so informed.

Particularly, such notice needs to be served where the owner of a home (referred to as ‘the structure owner’) plans to undertake any building and construction work described in Sections 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is restricted to the following:

The details that Sees need to provide in regard of works covered the above sections is various in each case. The requirements of Area 1 and Area 6 Notices are set out in those areas but the requirements of a Notice relating to Area 2 works is set out in Area 3 of the Act. It is very important to keep in mind that the credibility of any notification not supplying all the relevant info or served in the inaccurate manner, could be open up to challenge in Court.

There is no basic kind of Notification although lots of people utilize those released by the RICS or variations added to the explanatory booklet issued by the Department for Communities and Local Government. Supplied all the details needed by the pertinent section of the Act is present, a simple letter would be equally valid.

Depending upon the scenarios of any provided job there might be more than one adjacent owner on whom discover requirements to be served in regard of the very same work and, when it comes to deep excavations, an Adjacent Owner might be besides an immediate neighbour. It is constantly more suitable to go over the designated deal with adjoining owners before serving them with formal composed notice – a proposal well described might relieve issues adequate to prevent a disagreement developing and prevent the necessity to select property surveyors.

There are 2 exceptions where the need to serve notice might be prevented:

  1. De minimis works: The government’s explanatory booklet states that some works on a party wall might be so small that service of notice under the Act would be normally regarded as not essential and give as examples works unlikely to affect the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support racks, kitchen cupboards, and so forth.
  2. Functions under Section 2 of the Act supplied that composed approval is obtained from all Adjacent Owners and Occupiers prior to work commences.

The three kinds of Notification are understood, respectively as:

A party structure notice need to be served a minimum of 2 months before the date on which it is proposed to begin that work. The other 2 notices should be served at least one month prior to work starting.

The obligatory info which Sees should consist of are as follows:

The majority of the pro-forma notifications in use include the following info as a matter of course despite the type of notice:

Section 10 of the Act states that where an adjacent owner does not authorization in writing to works informed by the building owner under Areas 3 and 6, both parties need to either settle on the appointment of a single property surveyor to act for both of them (referred to as the Agreed Surveyor), or each appoint their own property surveyor, to identify by award matters in dispute between the parties.

Where a project is straightforward, this may just include consideration of the time and way in which those works are to be performed. In more complex schemes, thought will need to be offered to a commensurately greater number of elements and indeed selected property surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The very same treatment is utilized to fix any subsequent disagreements between neighbouring owners that may develop in relation to the informed works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inaction on the part of the adjacent owner does not stop the statutory procedure. A dispute can arise by an adjoining owner actively dissenting, that is, communicating to the building owner an objection in regard of some matter emerging out of or incidental to the works – the methods of making that objection are trivial, but if he stays silent, neither dissenting nor consenting for a duration of 2 week after having been served with a Notification under either Section 3 or Area 6, the Act considers a dissent to have developed in any event.

There is no deemed dissent arrangement in Area 1 of the Act. A valid disagreement can still occur, and property surveyors be appointed in accordance with Area 10, in respect of works informed under that section but just as relates to real dissent on particular premises. An adjoining owner’s reasons for contesting Area 2 and Section 6 works are seldom specified prior to the consultation of property surveyors and in a lot of cases not even then.

Where dissent has emerged, whether real or considered, both owners are legally obliged to select an agreed property surveyor or, if they can not collectively agree on a bachelor, a property surveyor each and if requested to make such a visit by the other party, must do so within 10 days of the request being served. Failure to comply, automatically provides the owner making the demand the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This procedure is set out in area 10( 4) of the Act.

Where two surveyors are appointed, they are required to agree upon the choice, in writing, of a third surveyor who might be called upon by either of the property surveyors or either of the celebrations to identify the contested matters and make the essential award. The 3rd property surveyor is never selected by anybody but the Act gives the person so chose the same statutory powers as the two property surveyors.

Third property surveyors are most frequently hired where the two surveyors have reached an impasse in their deliberations over some specific point and often this can be in regard on the reasonableness of the charges of the surveyor appointed by the adjoining owner. Seldom will a 3rd property surveyor be asked to draw up an award in respect of the whole works but might accompany one or other of the two property surveyors to do so if the need develops.

There is no definition of who can be a property surveyor, but it ought to not be the same person that will monitor the works.

The award will set out the works that can be performed, who will pay the costs for the preparation of the award and inspection of the works to ensure that they abide by the works, and who will spend for the works. If the work is exclusively for the benefit of the structure owner, then they will typically be required to pay the charges and the cost of the works.

Parties have 2 week to appeal to the county court if they disagree with the award.

The Act permits access to the adjoining residential or commercial property for the functions of performing the works whether the adjoining owner allows or not, however they should be provided 14 days notification.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other documents can be served by electronic communications.

The information that Notices must provide in respect of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections but the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. A valid disagreement can still develop, and property surveyors be appointed in accordance with Section 10, in regard of works alerted under that area but just as relates to real dissent on particular grounds. An adjoining owner’s factors for challenging Section 2 and Section 6 works are rarely specified prior to the visit of surveyors and in numerous cases not even then.

Where dissent has actually emerged, whether actual or deemed, both owners are legally obliged to appoint a concurred surveyor or, if they can not jointly agree on a single individual, a property surveyor each and if requested to make such a consultation by the other party, need to do so within 10 days of the request being served.