The Faulkners Surveyors is a specialist Chartered Building Surveying Practice that runs throughout UK. The Faulkners Surveyors undertakes all elements of the Party Wall etc. Act 1996 and provides the following services:

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is a making it possible for Act, insofar as it approves the owner of a property the legal right to carry out specific works that might otherwise constitute trespass or annoyance.

It likewise looks for to secure the interests of adjacent owners from any potentially unfavorable impacts that such works may have by enforcing a requirement that all adjoining owners be provided prior notice of them.

In addition, the Act attends to a necessary conflict resolution procedure mediated by a statutorily designated property surveyor or surveyors if neighbouring owners have issues about the execution of any proposition so notified.

Specifically, such notification should be served where the owner of a residential or commercial property (referred to as ‘the building owner’) means to undertake any building work explained in Areas 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is restricted to the following:

The details that Discovers need to provide in respect of works covered the above sections is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those areas but the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. It is essential to keep in mind that the credibility of any notice not offering all the appropriate info or served in the incorrect manner, could be available to challenge in Court.

There is no basic kind of Notification although lots of people utilize those published by the RICS or variations added to the explanatory brochure provided by the Department for Communities and Local Government. Provided all the information needed by the pertinent area of the Act is present, a simple letter would be similarly legitimate.

Depending upon the scenarios of any offered task there may be more than one adjacent owner on whom see needs to be served in regard of the very same work and, when it comes to deep excavations, an Adjoining Owner may be aside from an instant neighbour. It is constantly preferable to discuss the designated works with adjoining owners before serving them with formal composed notice – a proposition well explained might reduce concerns sufficient to prevent a dispute developing and avoid the necessity to select property surveyors.

There are two exceptions where the need to serve notice might be avoided:

  1. De minimis works: The government’s explanatory pamphlet states that some works on a party wall may be so minor that service of notice under the Act would be generally considered as not necessary and give as examples works not likely to impact the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support shelves, cooking area cupboards, and so on.
  2. Functions under Area 2 of the Act provided that composed consent is acquired from all Adjoining Owners and Occupiers before work commences.

The 3 kinds of Notice are known, respectively as:

A party structure notification should be served a minimum of two months before the date on which it is proposed to start that work. The other 2 notices need to be served a minimum of one month prior to work beginning.

The obligatory information which Notices should include are as follows:

Most of the pro-forma notices in use include the following details as a matter of course regardless of the type of notification:

Area 10 of the Act stipulates that where an adjoining owner does not permission in writing to works notified by the building owner under Areas 3 and 6, both parties must either settle on the appointment of a single surveyor to act for both of them (referred to as the Agreed Property Surveyor), or each appoint their own property surveyor, to figure out by award matters in dispute in between the parties.

Where a job is straightforward, this may just involve factor to consider of the time and way in which those works are to be performed. In more complex plans, thought will have to be offered to a commensurately greater number of factors and undoubtedly designated surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The same treatment is utilized to resolve any subsequent conflicts between neighbouring owners that might develop in relation to the informed works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.

Inaction on the part of the adjacent owner does not halt the statutory procedure. A dispute can arise by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in respect of some matter arising out of or incidental to the works – the means of making that objection are not important, but if he stays quiet, neither dissenting nor consenting for a period of 2 week after having actually been served with a Notice under either Section 3 or Section 6, the Act considers a dissent to have occurred in any event.

There is no considered dissent arrangement in Section 1 of the Act. A legitimate dispute can still emerge, and surveyors be appointed in accordance with Section 10, in respect of works notified under that section but only as concerns actual dissent on specific premises. An adjacent owner’s reasons for contesting Area 2 and Section 6 works are seldom defined prior to the appointment of surveyors and in a lot of cases not even then.

Where dissent has emerged, whether real or deemed, both owners are lawfully required to appoint an agreed property surveyor or, if they can not jointly settle on a single person, a property surveyor each and if asked for to make such a visit by the other party, need to do so within 10 days of the demand being served. Failure to comply, immediately provides the owner making the request the statutory authority to select a surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where two property surveyors are selected, they are obliged to agree upon the choice, in composing, of a third surveyor who might be hired by either of the property surveyors or either of the celebrations to identify the disputed matters and make the needed award. The 3rd surveyor is never selected by anybody however the Act offers the person so chose the same statutory powers as the two surveyors.

3rd property surveyors are most typically called upon where the two surveyors have actually reached an impasse in their considerations over some specific point and often this can be in respect on the reasonableness of the charges of the property surveyor selected by the adjacent owner. Hardly ever will a third surveyor be asked to prepare an award in regard of the entire works however might join with one or other of the two surveyors to do so if the need arises.

There is no meaning of who can be a surveyor, but it must not be the same individual that will supervise the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and examination of the works to guarantee that they comply with the works, and who will pay for the works. If the work is exclusively for the advantage of the structure owner, then they will typically be required to pay the costs and the expense of the works.

If they disagree with the award, celebrations have 14 days to appeal to the county court.

The Act allows access to the adjoining residential or commercial property for the functions of carrying out the works whether the adjacent owner allows or not, nevertheless they must be given 2 week notice.

NB: The introduction of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 suggests that from 6 April 2016, notices and other documents can be served by electronic communications.

The details that Sees must offer in regard of works covered the above sections is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. A legitimate dispute can still develop, and property surveyors be appointed in accordance with Area 10, in regard of works informed under that area but just as relates to real dissent on particular premises. An adjacent owner’s factors for disputing Section 2 and Area 6 works are rarely defined prior to the consultation of surveyors and in many cases not even then.

Where dissent has actually occurred, whether real or considered, both owners are legally obliged to select an agreed property surveyor or, if they can not jointly agree on a single individual, a surveyor each and if asked for to make such a visit by the other party, must do so within 10 days of the demand being served.