Faulkners Surveyors offer a range of building surveying services specialising in Party Wall Services.

We pride ourselves on our flexibility and personal participation towards our clients requirements. Faulkners Surveyors are a broadening team of property surveyors with a wealth of experience, competence and ability. If you are trying to find an expert yet versatile approach to all your property matters then call Faulkners Surveyors for an useful chat.

Our property surveyors are managed by the Faculty of Party Wall Surveyors and carry expert indemnity insurance coverage to cover their work.

Party Wall (WikiPedia)

Commonly, the builder lays the wall surface along a residential property line separating two terraced houses, so that one half of the wall surface’s thickness exists on each side. This type of wall is generally architectural. Party walls can likewise be developed by 2 abutting wall surfaces developed at different times.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is a making it possible for Act, insofar as it approves the owner of a property the legal right to undertake particular works that might otherwise make up trespass or problem.

However, it likewise seeks to secure the interests of adjacent owners from any possibly unfavorable impacts that such works may have by enforcing a requirement that all adjacent owners be given prior notification of them.

In addition, the Act provides for a necessary conflict resolution treatment mediated by a statutorily designated surveyor or property surveyors if neighbouring owners have concerns about the implementation of any proposal so informed.

Particularly, such notice must be served where the owner of a residential or commercial property (referred to as ‘the building owner’) intends to undertake any building work described in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is restricted to the following:

The details that Notices need to provide in respect of works covered the above sections is various in each case. The requirements of Section 1 and Area 6 Notifications are set out in those areas but the requirements of a Notice relating to Area 2 works is set out in Area 3 of the Act. It is necessary to keep in mind that the validity of any notice not providing all the appropriate information or served in the inaccurate manner, could be open to challenge in Court.

There is no basic type of Notice although many individuals utilize those published by the RICS or versions appended to the explanatory booklet released by the Department for Communities and City Government. However, offered all the details required by the pertinent section of the Act is present, a basic letter would be equally valid.

Depending upon the situations of any provided task there may be more than one adjacent owner on whom see requirements to be served in regard of the same work and, in the case of deep excavations, an Adjacent Owner might be besides an instant neighbour. It is constantly more suitable to discuss the desired works with adjoining owners prior to serving them with official composed notice – a proposition well discussed may relieve issues enough to prevent a conflict emerging and avoid the requirement to appoint property surveyors.

There are 2 exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The federal government’s explanatory pamphlet states that some works on a party wall might be so minor that service of notification under the Act would be generally considered not essential and give as examples works unlikely to affect the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support shelves, kitchen area cabinets, and so on.
  2. Functions under Area 2 of the Act offered that written authorization is obtained from all Adjoining Owners and Occupiers before work commences.

The three kinds of Notice are known, respectively as:

A party structure notice need to be served a minimum of two months prior to the date on which it is proposed to start that work. The other 2 notices need to be served at least one month prior to work beginning.

The obligatory info which Sees should include are as follows:

Most of the pro-forma notifications in use consist of the following details as a matter of course no matter the kind of notification:

Section 10 of the Act specifies that where an adjacent owner does not permission in writing to works notified by the building owner under Areas 3 and 6, both celebrations must either settle on the consultation of a single property surveyor to act for both of them (known as the Agreed Property Surveyor), or each select their own property surveyor, to figure out by award matters in dispute in between the celebrations.

Where a job is straightforward, this may only include consideration of the time and way in which those works are to be performed. In more complex plans, thought will have to be given to a commensurately greater number of aspects and undoubtedly designated property surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The very same treatment is used to fix any subsequent conflicts between neighbouring owners that might develop in relation to the informed works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory procedure. A conflict can develop by an adjoining owner actively dissenting, that is, communicating to the structure owner an objection in regard of some matter emerging out of or incidental to the works – the means of making that objection are not important, but if he remains silent, neither dissenting nor consenting for a duration of 14 days after having been served with a Notification under either Area 3 or Area 6, the Act considers a dissent to have actually arisen in any event.

There is no deemed dissent arrangement in Area 1 of the Act. A legitimate disagreement can still develop, and surveyors be designated in accordance with Section 10, in respect of works notified under that area however just as concerns actual dissent on specific premises. An adjacent owner’s factors for disputing Section 2 and Area 6 works are rarely specified prior to the appointment of property surveyors and in a lot of cases not even then.

Where dissent has arisen, whether actual or considered, both owners are legally required to select a concurred surveyor or, if they can not jointly agree on a bachelor, a surveyor each and if requested to make such an appointment by the other party, must do so within 10 days of the demand being served. Failure to comply, immediately offers the owner making the request the statutory authority to appoint a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where 2 surveyors are selected, they are required to agree upon the selection, in writing, of a third surveyor who might be called upon by either of the property surveyors or either of the celebrations to figure out the disputed matters and make the necessary award. The third surveyor is never ever designated by anybody however the Act offers the person so picked the exact same statutory powers as the two surveyors.

3rd property surveyors are most commonly hired where the two property surveyors have reached an impasse in their deliberations over some specific point and often this can be in regard on the reasonableness of the fees of the surveyor designated by the adjacent owner. Hardly ever will a third property surveyor be asked to draw up an award in regard of the whole works however may accompany one or other of the two surveyors to do so if the need emerges.

There is no meaning of who can be a property surveyor, however it should not be the same individual that will monitor the works.

The award will set out the works that can be carried out, who will pay the fees for the preparation of the award and inspection of the works to guarantee that they abide by the works, and who will spend for the works. They will typically be required to pay the charges and the cost of the works if the work is exclusively for the advantage of the structure owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act allows access to the adjoining property for the functions of carrying out the works whether the adjoining owner permits or not, however they must be provided 2 week notice.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other files can be served by electronic communications.

The information that Observes need to supply in regard of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those sections however the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. A valid disagreement can still emerge, and property surveyors be selected in accordance with Section 10, in respect of works alerted under that section however just as concerns actual dissent on particular grounds. An adjacent owner’s factors for disputing Area 2 and Section 6 works are seldom defined prior to the appointment of property surveyors and in numerous cases not even then.

Where dissent has actually occurred, whether real or deemed, both owners are legally required to designate an agreed surveyor or, if they can not jointly agree on a single person, a property surveyor each and if asked for to make such a visit by the other party, need to do so within 10 days of the demand being served.