We are fully certified specialist Party Wall Surveyors with years of experience producing Schedule of Condition reports and lawfully serving Party Wall Agreements and Notices.
With offices in Central, South and North London it makes us perfectly placed to serve Greater London and the surrounding counties.
Whether you’re a Structure Owner preparing a new project or a neighbour who has been served a Party Wall Notification our understanding and experience ensures we are constantly best prepared to help with your Party Wall requirements.
Call now and consult with a Professional Surveyor for friendly expert suggestions.
Party Wall (WikiPedia)
Party Wall Act
The Party Wall and so on. Act 1996 is an allowing Act, insofar as it grants the owner of a residential or commercial property the legal right to carry out specific works that may otherwise constitute trespass or problem.
However, it likewise looks for to safeguard the interests of adjacent owners from any possibly adverse effects that such works may have by enforcing a requirement that all adjacent owners be provided prior notification of them.
In addition, the Act offers a necessary disagreement resolution treatment mediated by a statutorily designated surveyor or surveyors if neighbouring owners have concerns about the application of any proposal so alerted.
Particularly, such notice must be served where the owner of a home (called ‘the building owner’) plans to carry out any construction work described in Sections 1, 2 and 6 of the Act. Keep in mind that it is just those works that are covered by the Act and the scope is limited to the following:
- Section 1 applies where it is proposed to erect a new wall at a boundary that is not already built on.
- Area 2 issues existing party structures, that include party floorings, partitions and walls (that separate buildings or parts of buildings), party fence walls (basically a border wall between lands in different ownership which is developed astride a limit) and, in some instances, a neighbour’s independent residential or commercial property.
- Section 6 can apply to excavations as much as 6 m far from a building or structure on neighbouring land, subject to depth requirements which the Act sets out.
The details that Discovers need to supply in regard of works covered the above sections is different in each case. The requirements of Section 1 and Area 6 Notices are set out in those areas however the requirements of a Notification associating with Area 2 works is set out in Section 3 of the Act. It is very important to keep in mind that the validity of any notice not offering all the pertinent info or served in the incorrect way, could be open up to challenge in Court.
There is no standard type of Notification although many people utilize those released by the RICS or variations added to the explanatory pamphlet provided by the Department for Communities and City Government. Offered all the details required by the appropriate section of the Act is present, a simple letter would be equally legitimate.
Depending upon the circumstances of any offered task there may be more than one adjacent owner on whom observe requirements to be served in respect of the exact same work and, in the case of deep excavations, an Adjoining Owner might be aside from an instant neighbour. It is always preferable to discuss the designated works with adjacent owners before serving them with official written notification – a proposal well explained may minimize concerns enough to prevent a conflict emerging and prevent the requirement to designate surveyors.
There are two exceptions where the need to serve notice might be prevented:
- De minimis works: The government’s explanatory pamphlet states that some deal with a party wall might be so small that service of notification under the Act would be typically regarded as not required and give as examples works unlikely to affect the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support shelves, kitchen area cupboards, and the like.
- Functions under Section 2 of the Act supplied that composed permission is acquired from all Adjoining Owners and Occupiers before work commences.
The three kinds of Notice are known, respectively as:
- Section 1: Line of Junction Notification
- Area 3 (for S2 works): Party Structure Notice
- Section 6: Notification of Adjacent Excavation
A party structure notification should be served at least 2 months before the date on which it is proposed to begin that work. The other 2 notices need to be served a minimum of one month prior to work starting.
The obligatory info which Notices must contain are as follows:
- Line of Junction Notification:
- An indication of the structure owner’s desire to build a wall.
- A description of the wall.
- Party Structure Notification:
- The name and address of the structure owner.
- The nature and particulars of the proposed work.
- The date on which the proposed work will start.
- Notification of Adjacent Excavation:
- A sign of the structure owner’s propositions.
- A declaration as to whether the building owner proposes to underpin or otherwise strengthen or secure the foundations of the building or structure of the adjoining owner.
- Accompanying areas and plans showing: a) the website and depth of any excavation the building owner proposes to make; b) if he proposes to erect a building or structure, its site.
Most of the pro-forma notifications in use include the following details as a matter of course no matter the type of notification:
- The date of the notice.
- The name and addresses of both the building and adjacent owners (and the addresses of the residential or commercial properties being worked on/affected if different).
- A statement regarding the beginning of works relative to the suitable notice duration.
- If the recipient actively dissents from the works or stops working to respond within 14 days, an advisory note discussing what takes place.
Section 10 of the Act states that where an adjoining owner does not consent in writing to works informed by the building owner under Sections 3 and 6, both celebrations need to either settle on the consultation of a single property surveyor to act for both of them (called the Agreed Property Surveyor), or each designate their own property surveyor, to identify by award matters in dispute in between the celebrations.
Where a job is straightforward, this may only include consideration of the time and way in which those works are to be performed. In more complex schemes, thought will need to be provided to a commensurately greater number of aspects and undoubtedly selected surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.
The exact same procedure is utilized to fix any subsequent disagreements in between neighbouring owners that may develop in relation to the informed works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.
Inactiveness on the part of the adjoining owner does not halt the statutory process. A conflict can arise by an adjacent owner actively dissenting, that is, interacting to the building owner an objection in respect of some matter arising out of or incidental to the works – the means of making that objection are not important, however if he remains quiet, neither dissenting nor consenting for a duration of 14 days after having actually been served with a Notification under either Section 3 or Area 6, the Act deems a dissent to have occurred in any event.
There is no deemed dissent provision in Section 1 of the Act. A valid disagreement can still arise, and surveyors be selected in accordance with Area 10, in respect of works alerted under that area but just as relates to real dissent on specific premises. An adjacent owner’s factors for challenging Area 2 and Section 6 works are rarely defined prior to the visit of property surveyors and in most cases not even then.
Where dissent has arisen, whether real or deemed, both owners are legally required to select a concurred property surveyor or, if they can not collectively agree on a single person, a surveyor each and if requested to make such an appointment by the other party, must do so within 10 days of the demand being served. Failure to comply, immediately offers the owner making the demand the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.
Where 2 surveyors are selected, they are obliged to agree upon the choice, in writing, of a 3rd property surveyor who may be called upon by either of the surveyors or either of the celebrations to figure out the disputed matters and make the essential award. The third property surveyor is never selected by anyone but the Act gives the individual so selected the exact same statutory powers as the two surveyors.
3rd surveyors are most typically called upon where the two property surveyors have actually reached a deadlock in their considerations over some particular point and often this can be in regard on the reasonableness of the costs of the surveyor designated by the adjacent owner. Rarely will a 3rd surveyor be asked to prepare an award in regard of the entire works however might join with one or other of the two surveyors to do so if the requirement occurs.
There is no meaning of who can be a property surveyor, however it needs to not be the same individual that will supervise the works.
The award will set out the works that can be carried out, who will pay the fees for the preparation of the award and assessment of the works to guarantee that they comply with the works, and who will spend for the works. If the work is entirely for the advantage of the structure owner, then they will typically be required to pay the fees and the cost of the works.
If they disagree with the award, parties have 14 days to appeal to the county court.
The Act enables access to the adjoining home for the functions of carrying out the works whether the adjacent owner allows or not, nevertheless they should be provided 2 week notification.
NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 suggests that from 6 April 2016, notifications and other documents can be served by electronic communications.
The info that Discovers must supply in regard of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those areas however the requirements of a Notice relating to Area 2 works is set out in Section 3 of the Act. A legitimate conflict can still arise, and property surveyors be appointed in accordance with Section 10, in respect of works alerted under that section but only as relates to actual dissent on particular premises. An adjacent owner’s factors for disputing Section 2 and Section 6 works are seldom defined prior to the consultation of property surveyors and in many cases not even then.
Where dissent has occurred, whether real or considered, both owners are lawfully required to select a concurred property surveyor or, if they can not collectively agree on a single person, a property surveyor each and if asked for to make such a visit by the other party, must do so within 10 days of the demand being served.
Related Articles
Around the Web