Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an allowing Act, insofar as it approves the owner of a residential or commercial property the legal right to undertake particular works that might otherwise constitute trespass or nuisance.

Nevertheless, it likewise seeks to secure the interests of adjoining owners from any potentially negative results that such works may have by imposing a requirement that all adjoining owners be given prior notice of them.

In addition, the Act provides for a necessary disagreement resolution procedure moderated by a statutorily appointed surveyor or property surveyors if neighbouring owners have issues about the application of any proposal so informed.

Particularly, such notice should be served where the owner of a residential or commercial property (called ‘the building owner’) plans to carry out any construction work explained in Areas 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is limited to the following:

The information that Notices need to offer in regard of works covered the above areas is various in each case. The requirements of Section 1 and Area 6 Notices are set out in those sections but the requirements of a Notification associating with Section 2 works is set out in Area 3 of the Act. It is essential to keep in mind that the validity of any notification not offering all the relevant details or served in the inaccurate manner, could be open up to challenge in Court.

There is no basic form of Notification although many people use those published by the RICS or versions added to the explanatory pamphlet issued by the Department for Communities and Local Government. Provided all the details required by the pertinent area of the Act is present, a simple letter would be equally legitimate.

Depending on the scenarios of any given job there might be more than one adjacent owner on whom discover requirements to be served in respect of the very same work and, in the case of deep excavations, an Adjoining Owner might be other than an instant neighbour. It is constantly preferable to discuss the intended works with adjacent owners before serving them with formal composed notification – a proposal well discussed might ease concerns sufficient to prevent a conflict occurring and avoid the need to appoint property surveyors.

There are two exceptions where the need to serve notice may be prevented:

  1. De minimis works: The federal government’s explanatory pamphlet says that some deal with a party wall may be so small that service of notice under the Act would be generally considered not essential and give as examples works not likely to affect the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support racks, kitchen cabinets, and the like.
  2. Works under Section 2 of the Act provided that written approval is acquired from all Adjacent Owners and Occupiers prior to work commences.

The 3 kinds of Notice are known, respectively as:

A party structure notification must be served at least 2 months before the date on which it is proposed to begin that work. The other 2 notices should be served at least one month prior to work commencing.

The compulsory info which Notices need to consist of are as follows:

Most of the pro-forma notifications in use consist of the following details as a matter of course regardless of the kind of notice:

Area 10 of the Act states that where an adjacent owner does not permission in writing to works notified by the structure owner under Areas 3 and 6, both parties need to either agree on the appointment of a single surveyor to act for both of them (referred to as the Agreed Property Surveyor), or each select their own property surveyor, to identify by award matters in dispute between the parties.

Where a project is straightforward, this may just involve factor to consider of the time and way in which those works are to be performed. In more complex plans, thought will have to be offered to a commensurately greater number of elements and undoubtedly designated property surveyors have the statutory jurisdiction to make an award in regard of any matter gotten in touch with any work to which the act relates.

The exact same procedure is utilized to deal with any subsequent disagreements in between neighbouring owners that may arise in relation to the alerted works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inaction on the part of the adjacent owner does not stop the statutory procedure. A disagreement can emerge by an adjoining owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter arising out of or incidental to the works – the ways of making that objection are not important, however if he remains silent, neither consenting nor dissenting for a duration of 14 days after having actually been served with a Notice under either Area 3 or Area 6, the Act deems a dissent to have developed in any event.

There is no considered dissent arrangement in Section 1 of the Act. A valid conflict can still emerge, and surveyors be designated in accordance with Area 10, in regard of works notified under that area but only as relates to actual dissent on specific grounds. An adjacent owner’s factors for challenging Section 2 and Area 6 works are hardly ever defined prior to the appointment of surveyors and oftentimes not even then.

Where dissent has arisen, whether actual or considered, both owners are lawfully obliged to designate a concurred surveyor or, if they can not collectively agree on a bachelor, a property surveyor each and if requested to make such a visit by the other party, need to do so within 10 days of the request being served. Failure to comply, automatically gives the owner making the request the statutory authority to appoint a property surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where two surveyors are selected, they are obliged to agree upon the selection, in writing, of a third surveyor who may be called upon by either of the surveyors or either of the parties to figure out the contested matters and make the required award. The 3rd property surveyor is never ever appointed by anyone however the Act gives the person so selected the exact same statutory powers as the two property surveyors.

Third property surveyors are most typically hired where the two property surveyors have reached a deadlock in their deliberations over some particular point and typically this can be in regard on the reasonableness of the costs of the property surveyor selected by the adjacent owner. Hardly ever will a third surveyor be asked to draw up an award in regard of the entire works however may join with one or other of the two surveyors to do so if the need occurs.

There is no meaning of who can be a surveyor, but it should not be the same individual that will monitor the works.

The award will set out the works that can be carried out, who will pay the fees for the preparation of the award and assessment of the works to make sure that they adhere to the works, and who will spend for the works. They will generally be needed to pay the charges and the cost of the works if the work is entirely for the advantage of the structure owner.

Parties have 14 days to attract the county court if they disagree with the award.

The Act permits access to the adjacent property for the functions of performing the works whether the adjacent owner gives permission or not, however they need to be offered 14 days notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notifications and other files can be served by electronic interactions.

The details that Discovers should provide in regard of works covered the above areas is various in each case. The requirements of Section 1 and Area 6 Notifications are set out in those areas but the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. A valid dispute can still arise, and property surveyors be designated in accordance with Section 10, in regard of works informed under that area however just as concerns real dissent on specific premises. An adjacent owner’s reasons for contesting Section 2 and Section 6 works are rarely specified prior to the appointment of surveyors and in many cases not even then.

Where dissent has actually arisen, whether real or deemed, both owners are lawfully obliged to designate a concurred property surveyor or, if they can not jointly agree on a single person, a property surveyor each and if asked for to make such a visit by the other party, need to do so within 10 days of the request being served.