Faulkners Surveyors As certified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect needed to advise upon and deal with Party Wall problems, such as:

  • Preparing and serving valid Party Wall Notices
  • Acting as the Structure Owners Party Wall Property Surveyor
  • Acting as the Adjoining Owners Party Wall Property Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Undertaking and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are experts and operate in accordance with the policies set down by the Faculty of Party Wall Surveyors.

The Party Wall Act and so on 1996 is law, failure to adhere to this legislation may result in works being unlawful.

Party Wall (WikiPedia)

A party wall (sometimes parti-wall or parting wall, also called typical wall or as a demising wall) is a splitting dividers in between two adjacent buildings that is shared by the passengers of each home or organization. Typically, the contractor lays the wall surface along a building line separating two terraced houses, to make sure that one half of the wall surface’s thickness pushes each side. This sort of wall surface is generally architectural. Event wall surfaces can also be created by 2 abutting walls built at different times. The term can be additionally utilized to explain a division in between different devices within a multi-unit apartment building. Really commonly the wall in this case is non-structural yet made to fulfill well-known requirements for audio and/or fire protection, i.e. a firewall program.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an allowing Act, insofar as it gives the owner of a residential or commercial property the legal right to carry out particular works that might otherwise constitute trespass or annoyance.

It likewise looks for to safeguard the interests of adjacent owners from any potentially adverse impacts that such works might have by enforcing a requirement that all adjoining owners be offered prior notice of them.

In addition, the Act attends to a mandatory dispute resolution treatment moderated by a statutorily appointed property surveyor or surveyors if neighbouring owners have issues about the execution of any proposition so notified.

Specifically, such notice must be served where the owner of a home (known as ‘the structure owner’) plans to undertake any construction work explained in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is limited to the following:

The details that Sees should provide in regard of works covered the above sections is various in each case. The requirements of Section 1 and Area 6 Notifications are set out in those areas however the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. It is necessary to keep in mind that the validity of any notification not supplying all the appropriate info or served in the inaccurate manner, could be open to challenge in Court.

There is no basic type of Notification although lots of people use those published by the RICS or versions added to the explanatory booklet released by the Department for Communities and City Government. However, offered all the information needed by the appropriate section of the Act exists, an easy letter would be equally legitimate.

Depending upon the circumstances of any given task there may be more than one adjacent owner on whom observe needs to be served in respect of the very same work and, when it comes to deep excavations, an Adjoining Owner might be besides an immediate neighbour. It is always preferable to discuss the intended deal with adjacent owners before serving them with official composed notification – a proposition well discussed may relieve concerns sufficient to prevent a conflict arising and prevent the need to appoint surveyors.

There are 2 exceptions where the requirement to serve notice might be prevented:

  1. De minimis works: The federal government’s explanatory brochure says that some works on a party wall may be so minor that service of notice under the Act would be generally regarded as not necessary and give as examples works not likely to affect the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support racks, kitchen area cabinets, and the like.
  2. Functions under Section 2 of the Act provided that composed approval is acquired from all Adjacent Owners and Occupiers prior to work commences.

The 3 types of Notification are understood, respectively as:

A party structure notification must be served a minimum of two months prior to the date on which it is proposed to begin that work. The other 2 notifications should be served at least one month prior to work commencing.

The necessary information which Sees need to consist of are as follows:

Most of the pro-forma notifications in use consist of the following details as a matter of course despite the type of notice:

Area 10 of the Act stipulates that where an adjoining owner does not permission in writing to works alerted by the building owner under Sections 3 and 6, both parties must either agree on the consultation of a single surveyor to act for both of them (referred to as the Agreed Surveyor), or each appoint their own surveyor, to figure out by award matters in dispute in between the parties.

Where a job is straightforward, this may just involve consideration of the time and manner in which those works are to be carried out. In more complex plans, believed will have to be given to a commensurately greater number of elements and undoubtedly designated surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The same treatment is utilized to solve any subsequent conflicts between neighbouring owners that may arise in relation to the notified works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory process. A dispute can occur by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in regard of some matter arising out of or incidental to the works – the ways of making that objection are trivial, but if he stays silent, neither consenting nor dissenting for a period of 2 week after having actually been served with a Notification under either Section 3 or Section 6, the Act considers a dissent to have occurred in any event.

There is no deemed dissent arrangement in Section 1 of the Act. A valid dispute can still arise, and surveyors be designated in accordance with Area 10, in respect of works alerted under that section however just as regards actual dissent on specific premises. An adjoining owner’s reasons for contesting Area 2 and Section 6 works are hardly ever specified prior to the visit of property surveyors and oftentimes not even then.

Where dissent has actually developed, whether actual or considered, both owners are legally obliged to designate an agreed property surveyor or, if they can not collectively settle on a single person, a surveyor each and if asked for to make such a visit by the other party, must do so within 10 days of the request being served. Failure to comply, instantly gives the owner making the request the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where 2 surveyors are appointed, they are obliged to agree upon the selection, in composing, of a 3rd property surveyor who might be hired by either of the property surveyors or either of the parties to identify the contested matters and make the essential award. The 3rd property surveyor is never designated by anybody but the Act provides the person so chose the very same statutory powers as the two surveyors.

3rd surveyors are most typically hired where the two property surveyors have reached a deadlock in their considerations over some specific point and often this can be in respect on the reasonableness of the charges of the property surveyor appointed by the adjacent owner. Seldom will a 3rd property surveyor be asked to draw up an award in regard of the entire works however might join with one or other of the two property surveyors to do so if the need emerges.

There is no meaning of who can be a property surveyor, however it ought to not be the same person that will supervise the works.

The award will set out the works that can be carried out, who will pay the costs for the preparation of the award and evaluation of the works to ensure that they adhere to the works, and who will pay for the works. If the work is solely for the benefit of the structure owner, then they will typically be required to pay the costs and the expense of the works.

Celebrations have 14 days to attract the county court if they disagree with the award.

The Act permits access to the adjoining property for the functions of performing the works whether the adjacent owner allows or not, however they must be offered 14 days notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notifications and other files can be served by electronic communications.

The information that Discovers must supply in respect of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notifications are set out in those areas but the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. A valid dispute can still arise, and property surveyors be appointed in accordance with Section 10, in regard of works informed under that area but just as concerns real dissent on specific premises. An adjacent owner’s reasons for disputing Area 2 and Area 6 works are hardly ever defined prior to the appointment of surveyors and in many cases not even then.

Where dissent has actually emerged, whether actual or deemed, both owners are legally obliged to select a concurred property surveyor or, if they can not collectively concur on a single person, a property surveyor each and if asked for to make such a consultation by the other party, should do so within 10 days of the demand being served.