Faulkners Surveyors As qualified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect needed to encourage upon and fix Party Wall problems, such as:

  • Preparing and serving valid Party Wall Notices
  • Acting as the Structure Owners Party Wall Surveyor
  • Acting as the Adjoining Owners Party Wall Property Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Undertaking and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are experts and work in accordance with the guidelines set down by the Faculty of Party Wall Surveyors.

The Party Wall Act and so on 1996 is law, failure to abide by this legislation may lead to works being illegal.

Party Wall (WikiPedia)

Usually, the builder lays the wall surface along a residential property line dividing two terraced homes, so that one half of the wall surface’s thickness exists on each side. This type of wall surface is generally architectural. Event wall surfaces can additionally be developed by 2 abutting wall surfaces built at different times.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an allowing Act, insofar as it gives the owner of a residential or commercial property the legal right to undertake specific works that may otherwise make up trespass or problem.

It also seeks to secure the interests of adjoining owners from any possibly adverse results that such works might have by imposing a requirement that all adjacent owners be given prior notice of them.

In addition, the Act offers a mandatory disagreement resolution treatment moderated by a statutorily designated surveyor or surveyors if neighbouring owners have concerns about the application of any proposition so informed.

Particularly, such notice needs to be served where the owner of a home (known as ‘the structure owner’) plans to carry out any building and construction work explained in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is restricted to the following:

The details that Sees should offer in regard of works covered the above sections is different in each case. The requirements of Area 1 and Area 6 Notices are set out in those sections but the requirements of a Notice connecting to Section 2 works is set out in Section 3 of the Act. It is important to keep in mind that the validity of any notification not providing all the appropriate info or served in the inaccurate manner, could be available to challenge in Court.

There is no standard form of Notice although lots of people use those published by the RICS or variations added to the explanatory brochure issued by the Department for Communities and City Government. Nevertheless, supplied all the details needed by the appropriate section of the Act exists, a basic letter would be similarly legitimate.

Depending upon the situations of any offered project there may be more than one adjoining owner on whom notice requirements to be served in respect of the exact same work and, when it comes to deep excavations, an Adjacent Owner might be aside from an immediate neighbour. It is always preferable to go over the designated deal with adjoining owners before serving them with official written notification – a proposal well discussed might alleviate concerns enough to prevent a disagreement arising and prevent the requirement to appoint property surveyors.

There are two exceptions where the requirement to serve notice might be prevented:

  1. De minimis works: The federal government’s explanatory pamphlet states that some works on a party wall may be so small that service of notification under the Act would be typically regarded as not needed and give as examples works unlikely to impact the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support racks, kitchen cabinets, and so forth.
  2. Functions under Section 2 of the Act offered that written approval is gotten from all Adjacent Owners and Occupiers prior to work commences.

The 3 kinds of Notice are understood, respectively as:

A party structure notice must be served at least two months prior to the date on which it is proposed to start that work. The other 2 notifications need to be served a minimum of one month prior to work starting.

The obligatory details which Observes should contain are as follows:

Most of the pro-forma notifications in use include the following info as a matter of course no matter the type of notification:

Section 10 of the Act states that where an adjoining owner does not authorization in writing to works alerted by the structure owner under Sections 3 and 6, both parties need to either agree on the visit of a single surveyor to act for both of them (called the Agreed Surveyor), or each designate their own property surveyor, to determine by award matters in dispute between the parties.

Where a job is straightforward, this might just include consideration of the time and way in which those works are to be performed. In more complex plans, believed will have to be provided to a commensurately greater number of aspects and undoubtedly designated property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The exact same treatment is utilized to fix any subsequent disputes in between neighbouring owners that might arise in relation to the alerted works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inaction on the part of the adjoining owner does not halt the statutory process. A disagreement can emerge by an adjoining owner actively dissenting, that is, communicating to the structure owner an objection in regard of some matter emerging out of or incidental to the works – the means of making that objection are not important, however if he stays quiet, neither dissenting nor consenting for a duration of 2 week after having been served with a Notice under either Section 3 or Area 6, the Act deems a dissent to have developed in any event.

There is no considered dissent arrangement in Area 1 of the Act. A valid conflict can still emerge, and property surveyors be appointed in accordance with Section 10, in regard of works informed under that area but just as concerns real dissent on particular grounds. An adjoining owner’s reasons for contesting Section 2 and Section 6 works are hardly ever specified prior to the visit of property surveyors and in a lot of cases not even then.

Where dissent has actually occurred, whether actual or considered, both owners are legally obliged to appoint a concurred property surveyor or, if they can not jointly agree on a single person, a surveyor each and if requested to make such a visit by the other party, need to do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the demand the statutory authority to appoint a surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where two property surveyors are selected, they are required to agree upon the choice, in writing, of a 3rd surveyor who may be hired by either of the surveyors or either of the celebrations to figure out the challenged matters and make the essential award. The 3rd property surveyor is never ever selected by anybody however the Act provides the individual so chose the same statutory powers as the two surveyors.

Third surveyors are most frequently called upon where the two property surveyors have actually reached a deadlock in their deliberations over some particular point and often this can be in regard on the reasonableness of the charges of the property surveyor designated by the adjoining owner. Rarely will a 3rd surveyor be asked to prepare an award in regard of the entire works but may accompany one or other of the two surveyors to do so if the requirement emerges.

There is no meaning of who can be a surveyor, but it needs to not be the same person that will monitor the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and evaluation of the works to ensure that they comply with the works, and who will spend for the works. They will typically be required to pay the charges and the expense of the works if the work is entirely for the advantage of the structure owner.

Parties have 2 week to interest the county court if they disagree with the award.

The Act permits access to the adjoining residential or commercial property for the purposes of carrying out the works whether the adjacent owner allows or not, nevertheless they need to be offered 14 days notification.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other files can be served by electronic communications.

The info that Sees need to offer in respect of works covered the above areas is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. A valid disagreement can still occur, and surveyors be appointed in accordance with Area 10, in respect of works informed under that section but just as relates to actual dissent on particular grounds. An adjoining owner’s reasons for challenging Section 2 and Area 6 works are seldom defined prior to the consultation of surveyors and in many cases not even then.

Where dissent has actually arisen, whether actual or deemed, both owners are legally obliged to select a concurred property surveyor or, if they can not collectively concur on a single person, a surveyor each and if requested to make such an appointment by the other party, must do so within 10 days of the request being served.