Faulkners Surveyors As certified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect necessary to recommend upon and fix Party Wall concerns, such as:

  • Preparing and serving valid Party Wall Notices
  • Acting as the Structure Owners Party Wall Surveyor
  • Acting as the Adjoining Owners Party Wall Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Carrying out and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are specialists and work in accordance with the regulations set down by the Faculty of Party Wall Surveyors.

The Party Wall Act etc. 1996 is law, failure to abide by this legislation might result in works being illegal.

Party Wall (WikiPedia)

A party wall (sometimes parti-wall or parting wall surface, likewise recognized as typical wall surface or as a demising wall) is a separating dividers in between 2 adjoining buildings that is shared by the occupants of each home or company. Normally, the builder lays the wall along a residential property line separating two terraced houses, to make sure that one half of the wall surface’s thickness rests on each side. This kind of wall is generally architectural. Celebration wall surfaces can additionally be developed by 2 abutting walls constructed at various times. The term can be likewise utilized to describe a department in between separate units within a multi-unit home complex. Extremely frequently the wall surface in this situation is non-structural however created to fulfill well established standards for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it gives the owner of a property the legal right to carry out particular works that may otherwise constitute trespass or problem.

Nevertheless, it likewise looks for to secure the interests of adjoining owners from any possibly adverse impacts that such works may have by imposing a requirement that all adjoining owners be given prior notice of them.

In addition, the Act provides for a mandatory disagreement resolution procedure mediated by a statutorily appointed property surveyor or property surveyors if neighbouring owners have issues about the application of any proposition so alerted.

Specifically, such notification needs to be served where the owner of a residential or commercial property (referred to as ‘the building owner’) means to carry out any building work explained in Areas 1, 2 and 6 of the Act. Note that it is just those works that are covered by the Act and the scope is restricted to the following:

The info that Notices need to provide in regard of works covered the above sections is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas however the requirements of a Notice associating with Section 2 works is set out in Area 3 of the Act. It is essential to keep in mind that the credibility of any notice not providing all the appropriate details or served in the incorrect manner, could be open to challenge in Court.

There is no basic type of Notice although many people use those published by the RICS or versions appended to the explanatory brochure issued by the Department for Communities and Local Government. Nevertheless, offered all the info required by the relevant area of the Act exists, a basic letter would be similarly legitimate.

Depending upon the circumstances of any given project there may be more than one adjoining owner on whom discover needs to be served in regard of the very same work and, in the case of deep excavations, an Adjacent Owner might be other than an instant neighbour. It is constantly more effective to talk about the designated deal with adjoining owners prior to serving them with formal composed notice – a proposal well described may alleviate concerns sufficient to prevent a dispute developing and prevent the necessity to select property surveyors.

There are 2 exceptions where the need to serve notice may be avoided:

  1. De minimis works: The government’s explanatory brochure says that some deal with a party wall may be so minor that service of notification under the Act would be generally considered not essential and give as examples works unlikely to impact the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support shelves, kitchen area cupboards, and the like.
  2. Functions under Section 2 of the Act provided that composed permission is gotten from all Adjoining Owners and Occupiers before work commences.

The 3 types of Notification are known, respectively as:

A party structure notification need to be served at least 2 months prior to the date on which it is proposed to start that work. The other two notifications need to be served at least one month prior to work commencing.

The obligatory information which Sees must contain are as follows:

Most of the pro-forma notices in use include the following details as a matter of course no matter the type of notification:

Area 10 of the Act specifies that where an adjoining owner does not permission in writing to works alerted by the building owner under Sections 3 and 6, both parties must either agree on the appointment of a single property surveyor to act for both of them (known as the Agreed Surveyor), or each select their own surveyor, to figure out by award matters in dispute between the celebrations.

Where a job is straightforward, this may just involve factor to consider of the time and manner in which those works are to be carried out. In more complex schemes, believed will have to be given to a commensurately greater number of aspects and undoubtedly appointed property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The same treatment is utilized to deal with any subsequent disputes in between neighbouring owners that may occur in relation to the informed works, consisting of any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjacent owner does not halt the statutory process. A conflict can develop by an adjoining owner actively dissenting, that is, communicating to the building owner an objection in respect of some matter emerging out of or incidental to the works – the means of making that objection are not important, however if he stays quiet, neither dissenting nor consenting for a duration of 14 days after having been served with a Notification under either Section 3 or Section 6, the Act considers a dissent to have emerged in any event.

There is no considered dissent provision in Area 1 of the Act. A valid dispute can still occur, and surveyors be designated in accordance with Area 10, in respect of works notified under that section but just as relates to real dissent on particular premises. An adjacent owner’s factors for contesting Area 2 and Area 6 works are rarely defined prior to the appointment of surveyors and in many cases not even then.

Where dissent has actually developed, whether real or deemed, both owners are lawfully required to select an agreed property surveyor or, if they can not collectively agree on a single person, a surveyor each and if requested to make such a consultation by the other party, should do so within 10 days of the demand being served. Failure to comply, instantly provides the owner making the request the statutory authority to designate a surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two surveyors are selected, they are required to agree upon the selection, in writing, of a third property surveyor who may be hired by either of the surveyors or either of the parties to determine the disputed matters and make the necessary award. The third surveyor is never designated by anyone however the Act gives the person so selected the same statutory powers as the two surveyors.

3rd property surveyors are most typically hired where the two property surveyors have actually reached a deadlock in their deliberations over some particular point and often this can be in respect on the reasonableness of the costs of the property surveyor designated by the adjacent owner. Hardly ever will a 3rd property surveyor be asked to prepare an award in regard of the whole works but may accompany one or other of the two property surveyors to do so if the need develops.

There is no definition of who can be a surveyor, but it should not be the same person that will monitor the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and inspection of the works to ensure that they adhere to the works, and who will pay for the works. If the work is exclusively for the benefit of the structure owner, then they will typically be required to pay the costs and the expense of the works.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act permits access to the adjacent home for the functions of performing the works whether the adjacent owner permits or not, nevertheless they must be offered 14 days notification.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notifications and other documents can be served by electronic communications.

The info that Sees should supply in respect of works covered the above areas is different in each case. The requirements of Section 1 and Section 6 Notifications are set out in those sections however the requirements of a Notification relating to Section 2 works is set out in Area 3 of the Act. A legitimate disagreement can still emerge, and surveyors be designated in accordance with Area 10, in regard of works notified under that area however only as concerns actual dissent on particular grounds. An adjacent owner’s factors for disputing Area 2 and Section 6 works are seldom specified prior to the visit of property surveyors and in lots of cases not even then.

Where dissent has actually emerged, whether real or deemed, both owners are legally obliged to appoint an agreed surveyor or, if they can not jointly concur on a single person, a surveyor each and if requested to make such a visit by the other party, should do so within 10 days of the request being served.