We are fully certified professional Party Wall Surveyors with years of experience producing Set up of Condition reports and lawfully serving Party Wall Agreements and Notices.

With workplaces in Central, South and North London it makes us completely positioned to serve Greater London and the surrounding counties.

Whether you’re a Structure Owner preparing a brand-new task or a neighbour who has actually been served a Party Wall Notification our understanding and experience ensures we are constantly best prepared to assist with your Party Wall requirements.

Call now and speak to a Professional Surveyor for friendly professional suggestions.

Party Wall (WikiPedia)

A party wall (periodically parti-wall or parting wall, additionally referred to as common wall surface or as a demising wall surface) is a separating dividers between two adjoining structures that is shared by the occupants of each home or service. Commonly, the contractor lays the wall along a home line dividing two terraced homes, so that one fifty percent of the wall’s thickness rests on each side. This kind of wall is typically architectural. Celebration wall surfaces can likewise be created by two abutting wall surfaces constructed at different times. The term can be likewise used to define a department in between separate devices within a multi-unit home complex. Very usually the wall in this situation is non-structural but created to satisfy established criteria for audio and/or fire security, i.e. a firewall software.

party wall

The Party Wall Act 1996

as it effects the garden

At first sight, it is easy to believe that the 1996 Party Wall Act does not affect garden construction, however it does affect the building of limit walls even if not part of buildings and can also applies to deep excavations.

The Party Wall Act 1996 came into force in 1997, so it is now law and gives you rights and duties whichever the side of the ‘wall’ you are on i.e. whether you are planning/doing deal with a pertinent structure or if your neighbour is.

The Party Wall Act does not apply to limit fences.

The Party Wall Act does not impact any requirement for Preparation Authorization for any work carried out. Similarly, having Planning Consent does not negate the requirements under the Party Wall Act.

The Party Wall Act comes into effect if somebody is preparing to do deal with an appropriate structure, for the functions of the Act ‘party wall’ does not just indicate the wall in between two semi-detached homes, as far as garden enthusiasts are worried it covers:

For information of how the Party Wall Act impacts building operate in general, have a look at this page.

Similar to all work impacting neighbours, it is constantly much better to reach a friendly agreement instead of resort to any law. Even where the work needs a notification to be served, it is much better to informally go over the desired work, consider the neighbours comments, and amend your plans (if suitable) before serving the notification.

What garden work needs a notification and approval.

The basic concept of the Party Wall Act is that all work which may have an effect upon the structural strength or assistance function of the party wall or might trigger damage to the neighbouring side of the wall should be notified. If in doubt, suggestions should be sought from a local Structure Control Office or expert surveyor/architect.

Operate in the garden covered by the Party Wall Act include:

Boundary walls

If the prepared deal with a limit wall falls under the Party Wall Act, a notification should be issued to all affected neighbouring parties. The notification needs to consist of (see sample letters in Part 5 of the Party Wall leaflet):.

If the planned work is a new boundary wall approximately or astride the border line the process of serving a notice under the Party Wall Act is as follows:.

See below regarding what happens in the event of a dispute/objection.

Excavations.

If the planned work is an excavation within the distance/depth covered by the Party Wall Act, the notification needs to be served a minimum of one month prior to the prepared start day of the work. Neighbouring parties should provide written contract within 2 week or a disagreement is considered to have happened.

See listed below concerning what occurs in the event of a dispute/objection.

If a conflict emerges, what occurs.

If arrangement can not be reached in between neighbouring parties, the process is as follows:.

When you have agreement.

All work should comply with the notification when you have contract. All the contracts should be maintained to make sure that a record of the granted permission is kept; a subsequent buyer of the property may want to develop that the work was carried out in accordance with the Party Wall Act requirements.

Keep in mind:

Related Articles

Around the Web