We are Party Wall Surveyors specialising in party wall concerns in UK. We have over twenty 5 years experience of working in UK, acting for experts, organizations, in addition to for people.

Each quick is unique, and our devoted group of party wall surveyors is experienced in handling all manner of problems associating with party walls. We are proud to provide a bespoke service to match the differing requirements of our clients.

This site is designed to offer standard information in addition to providing you the chance to call us directly with your problems and requirements, hence allowing our expert Party Wall Surveyors to encourage you accordingly.

The current legislation dealing with party walls and associated matters is the Party Wall etc. Act 1996, which governs the rights and commitments of those proposing work to party walls/structures, and/or underpinning thereof, nearby excavations and/or structures (including stacked foundations).

Our team of Faulkners Surveyors Party Wall Surveyors offers an unique niche service, which allows you to have the best quality service at competitively priced costs.

For more information contact one of our Faulkners Surveyors Party Wall surveyors on 03300100262.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, additionally referred to as common wall or as a demising wall) is a separating dividers in between 2 adjacent structures that is shared by the occupants of each house or service. Generally, the building contractor lays the wall along a home line splitting 2 terraced homes, to ensure that one half of the wall’s thickness exists on each side. This kind of wall is typically structural. Party wall surfaces can additionally be created by 2 abutting wall surfaces developed at various times. The term can be additionally used to explain a department between separate units within a multi-unit apartment building. Really usually the wall surface in this instance is non-structural but made to fulfill recognized standards for sound and/or fire security, i.e. a firewall program.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an allowing Act, insofar as it gives the owner of a property the legal right to carry out particular works that might otherwise make up trespass or problem.

Nevertheless, it also looks for to protect the interests of adjoining owners from any potentially unfavorable effects that such works may have by enforcing a requirement that all adjacent owners be offered prior notice of them.

In addition, the Act offers a compulsory conflict resolution treatment moderated by a statutorily selected property surveyor or surveyors if neighbouring owners have issues about the execution of any proposition so notified.

Particularly, such notice needs to be served where the owner of a home (referred to as ‘the building owner’) plans to carry out any building work explained in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is restricted to the following:

The information that Sees must offer in regard of works covered the above sections is different in each case. The requirements of Area 1 and Area 6 Notices are set out in those sections but the requirements of a Notification connecting to Area 2 works is set out in Section 3 of the Act. It is essential to note that the validity of any notice not offering all the pertinent info or served in the inaccurate manner, could be available to challenge in Court.

There is no standard type of Notification although many people use those released by the RICS or variations appended to the explanatory pamphlet released by the Department for Communities and City Government. Supplied all the details required by the pertinent section of the Act is present, a simple letter would be similarly legitimate.

Depending upon the scenarios of any provided job there might be more than one adjacent owner on whom observe requirements to be served in respect of the very same work and, when it comes to deep excavations, an Adjoining Owner might be besides an immediate neighbour. It is constantly more suitable to discuss the desired deal with adjacent owners prior to serving them with formal composed notice – a proposition well explained might relieve issues sufficient to prevent a conflict occurring and avoid the need to appoint property surveyors.

There are two exceptions where the need to serve notice might be prevented:

  1. De minimis works: The government’s explanatory booklet says that some deal with a party wall might be so minor that service of notification under the Act would be typically considered not necessary and give as examples works not likely to impact the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support racks, kitchen area cupboards, and so forth.
  2. Functions under Section 2 of the Act offered that composed permission is acquired from all Adjoining Owners and Occupiers before work commences.

The 3 types of Notification are understood, respectively as:

A party structure notice need to be served at least 2 months before the date on which it is proposed to begin that work. The other two notices need to be served a minimum of one month prior to work beginning.

The mandatory info which Discovers should consist of are as follows:

Most of the pro-forma notices in use consist of the following information as a matter of course no matter the type of notification:

Area 10 of the Act states that where an adjacent owner does not authorization in writing to works alerted by the structure owner under Areas 3 and 6, both parties must either agree on the consultation of a single surveyor to act for both of them (known as the Agreed Surveyor), or each appoint their own property surveyor, to figure out by award matters in dispute in between the celebrations.

Where a task is straightforward, this may just involve consideration of the time and manner in which those works are to be performed. In more complex plans, believed will need to be given to a commensurately greater number of factors and undoubtedly designated surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The exact same treatment is used to resolve any subsequent disputes between neighbouring owners that may develop in relation to the notified works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not halt the statutory procedure. A dispute can develop by an adjoining owner actively dissenting, that is, communicating to the structure owner an objection in regard of some matter developing out of or incidental to the works – the ways of making that objection are not important, but if he remains silent, neither consenting nor dissenting for a period of 14 days after having been served with a Notification under either Section 3 or Section 6, the Act deems a dissent to have actually developed in any event.

There is no deemed dissent arrangement in Area 1 of the Act. A legitimate disagreement can still occur, and property surveyors be appointed in accordance with Section 10, in regard of works informed under that area however only as concerns real dissent on particular grounds. An adjoining owner’s reasons for disputing Area 2 and Area 6 works are hardly ever defined prior to the consultation of surveyors and in most cases not even then.

Where dissent has actually developed, whether actual or considered, both owners are lawfully required to select a concurred property surveyor or, if they can not jointly settle on a single person, a surveyor each and if asked for to make such a visit by the other party, need to do so within 10 days of the demand being served. Failure to comply, automatically gives the owner making the request the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two property surveyors are designated, they are obliged to agree upon the choice, in composing, of a third property surveyor who may be hired by either of the surveyors or either of the celebrations to figure out the contested matters and make the necessary award. The 3rd property surveyor is never selected by anyone however the Act provides the person so selected the very same statutory powers as the two property surveyors.

Third surveyors are most commonly called upon where the two surveyors have reached an impasse in their considerations over some particular point and frequently this can be in regard on the reasonableness of the fees of the surveyor designated by the adjoining owner. Hardly ever will a 3rd property surveyor be asked to prepare an award in regard of the entire works but may join with one or other of the two property surveyors to do so if the need occurs.

There is no meaning of who can be a property surveyor, but it must not be the same person that will monitor the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and examination of the works to ensure that they abide by the works, and who will spend for the works. They will typically be needed to pay the charges and the expense of the works if the work is entirely for the benefit of the building owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act permits access to the adjoining home for the functions of performing the works whether the adjoining owner allows or not, however they should be given 14 days notice.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notices and other files can be served by electronic interactions.

The info that Notices must supply in respect of works covered the above areas is different in each case. The requirements of Area 1 and Area 6 Notifications are set out in those areas but the requirements of a Notification relating to Section 2 works is set out in Area 3 of the Act. A valid dispute can still arise, and surveyors be appointed in accordance with Section 10, in respect of works notified under that section however just as regards actual dissent on particular grounds. An adjoining owner’s reasons for challenging Area 2 and Area 6 works are seldom defined prior to the consultation of property surveyors and in many cases not even then.

Where dissent has occurred, whether actual or considered, both owners are legally required to designate an agreed property surveyor or, if they can not collectively concur on a single individual, a property surveyor each and if asked for to make such a consultation by the other party, should do so within 10 days of the request being served.