Faulkners Surveyors As certified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect necessary to advise upon and deal with Party Wall concerns, such as:

  • Preparing and serving legitimate Party Wall Notices
  • Acting as the Building Owners Party Wall Property Surveyor
  • Acting as the Adjoining Owners Party Wall Property Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Undertaking and preparing Schedules of Condition
  • Preparation and settlement of Party Wall Awards

All our Party Wall Surveyors are specialists and operate in accordance with the guidelines set down by the Professors of Party Wall Surveyors.

The Party Wall Act etc. 1996 is law, failure to abide by this legislation may result in works being illegal.

Party Wall (WikiPedia)

A party wall (periodically parti-wall or parting wall, likewise called common wall or as a demising wall) is a dividing dividers in between two adjacent buildings that is shared by the occupants of each house or business. Typically, the contractor lays the wall along a property line splitting 2 terraced residences, so that one half of the wall surface’s density lies on each side. This kind of wall is normally structural. Celebration wall surfaces can likewise be created by 2 abutting walls constructed at various times. The term can be additionally utilized to explain a department in between separate units within a multi-unit home facility. Very typically the wall in this situation is non-structural but developed to fulfill recognized requirements for audio and/or fire security, i.e. a firewall program.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an enabling Act, insofar as it approves the owner of a home the legal right to undertake certain works that may otherwise make up trespass or problem.

Nevertheless, it likewise seeks to safeguard the interests of adjacent owners from any possibly unfavorable impacts that such works may have by imposing a requirement that all adjacent owners be given prior notice of them.

In addition, the Act attends to a mandatory disagreement resolution procedure mediated by a statutorily appointed surveyor or property surveyors if neighbouring owners have issues about the application of any proposition so alerted.

Specifically, such notice should be served where the owner of a home (referred to as ‘the structure owner’) means to carry out any building work explained in Sections 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is limited to the following:

The information that Notices must supply in regard of works covered the above sections is various in each case. The requirements of Area 1 and Area 6 Notifications are set out in those areas however the requirements of a Notice connecting to Area 2 works is set out in Section 3 of the Act. It is very important to note that the credibility of any notification not offering all the relevant info or served in the incorrect way, could be available to challenge in Court.

There is no basic kind of Notice although many people utilize those published by the RICS or versions added to the explanatory pamphlet provided by the Department for Communities and City Government. However, provided all the info required by the appropriate area of the Act exists, a simple letter would be similarly valid.

Depending on the scenarios of any offered task there might be more than one adjoining owner on whom discover needs to be served in respect of the very same work and, in the case of deep excavations, an Adjacent Owner may be other than an instant neighbour. It is constantly more effective to talk about the intended works with adjacent owners before serving them with official written notification – a proposition well described may minimize concerns sufficient to prevent a conflict emerging and prevent the necessity to designate surveyors.

There are two exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The federal government’s explanatory brochure states that some deal with a party wall might be so minor that service of notification under the Act would be typically regarded as not required and give as examples works not likely to impact the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support racks, kitchen cupboards, and the like.
  2. Functions under Area 2 of the Act provided that written approval is obtained from all Adjoining Owners and Occupiers before work commences.

The 3 kinds of Notification are understood, respectively as:

A party structure notification should be served at least 2 months prior to the date on which it is proposed to begin that work. The other two notices must be served a minimum of one month prior to work starting.

The mandatory info which Sees should contain are as follows:

The majority of the pro-forma notifications in use consist of the following information as a matter of course regardless of the kind of notification:

Area 10 of the Act specifies that where an adjacent owner does not consent in writing to works notified by the structure owner under Areas 3 and 6, both celebrations must either agree on the appointment of a single surveyor to act for both of them (called the Agreed Property Surveyor), or each appoint their own surveyor, to figure out by award matters in dispute in between the celebrations.

Where a project is straightforward, this may just include consideration of the time and way in which those works are to be performed. In more complex schemes, thought will have to be offered to a commensurately greater number of factors and indeed selected property surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The very same treatment is used to solve any subsequent disputes in between neighbouring owners that may occur in relation to the informed works, consisting of any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjoining owner does not stop the statutory procedure. A conflict can emerge by an adjacent owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter occurring out of or incidental to the works – the ways of making that objection are not important, but if he stays silent, neither dissenting nor consenting for a period of 2 week after having been served with a Notification under either Area 3 or Section 6, the Act considers a dissent to have developed in any event.

There is no deemed dissent provision in Area 1 of the Act. A legitimate disagreement can still emerge, and surveyors be appointed in accordance with Area 10, in regard of works alerted under that section however only as regards actual dissent on specific premises. An adjoining owner’s factors for challenging Section 2 and Area 6 works are rarely defined prior to the visit of property surveyors and in a lot of cases not even then.

Where dissent has actually developed, whether real or deemed, both owners are legally obliged to designate a concurred surveyor or, if they can not collectively agree on a bachelor, a surveyor each and if requested to make such a visit by the other party, need to do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the request the statutory authority to select a surveyor on behalf of the recalcitrant party. This treatment is set out in area 10( 4) of the Act.

Where 2 surveyors are appointed, they are required to agree upon the choice, in composing, of a third surveyor who may be hired by either of the property surveyors or either of the parties to identify the challenged matters and make the needed award. The 3rd surveyor is never appointed by anybody but the Act provides the person so chose the exact same statutory powers as the two surveyors.

3rd property surveyors are most frequently hired where the two property surveyors have actually reached an impasse in their considerations over some particular point and frequently this can be in respect on the reasonableness of the charges of the property surveyor selected by the adjacent owner. Hardly ever will a third surveyor be asked to prepare an award in regard of the entire works but may accompany one or other of the two surveyors to do so if the requirement develops.

There is no meaning of who can be a property surveyor, but it must not be the same person that will supervise the works.

The award will set out the works that can be carried out, who will pay the fees for the preparation of the award and examination of the works to guarantee that they comply with the works, and who will spend for the works. They will typically be required to pay the costs and the cost of the works if the work is exclusively for the advantage of the structure owner.

Celebrations have 2 week to appeal to the county court if they disagree with the award.

The Act enables access to the adjoining home for the purposes of carrying out the works whether the adjoining owner allows or not, however they must be offered 2 week notice.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other documents can be served by electronic interactions.

The details that Observes need to supply in respect of works covered the above sections is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas however the requirements of a Notification relating to Section 2 works is set out in Area 3 of the Act. A valid conflict can still occur, and property surveyors be designated in accordance with Area 10, in respect of works alerted under that section but just as regards real dissent on specific grounds. An adjoining owner’s reasons for challenging Area 2 and Area 6 works are rarely defined prior to the consultation of surveyors and in many cases not even then.

Where dissent has arisen, whether actual or deemed, both owners are lawfully required to select a concurred surveyor or, if they can not jointly concur on a single individual, a property surveyor each and if requested to make such a visit by the other party, must do so within 10 days of the request being served.