We are Party Wall Surveyors specialising in party wall concerns in UK. We have over twenty five years experience of working in UK, acting for experts, companies, as well as for people.

Each quick is special, and our dedicated team of party wall property surveyors is experienced in dealing with all manner of concerns connecting to party walls. We are proud to provide a bespoke service to match the varying requirements of our clients.

This site is created to provide fundamental information in addition to using you the chance to contact us directly with your issues and requirements, hence enabling our expert Party Wall Surveyors to recommend you appropriately.

The current legislation dealing with party walls and associated matters is the Party Wall etc. Act 1996, which governs the rights and obligations of those proposing work to party walls/structures, and/or underpinning thereof, surrounding excavations and/or structures (including piled foundations).

Our group of Faulkners Surveyors Party Wall Surveyors supplies a distinct niche service, which enables you to have the best quality service at competitively priced costs.

For more details contact one of our Faulkners Surveyors Party Wall surveyors on 03300100262.

Party Wall (WikiPedia)

A party wall (periodically parti-wall or parting wall, additionally recognized as common wall or as a demising wall) is a splitting partition between 2 adjacent structures that is shared by the owners of each house or business. Typically, the home builder lays the wall surface along a residential or commercial property line separating two terraced residences, to make sure that one half of the wall surface’s density lies on each side. This kind of wall is normally architectural. Party wall surfaces can likewise be created by 2 abutting wall surfaces developed at various times. The term can be likewise utilized to define a department between different devices within a multi-unit apartment building. Extremely often the wall in this case is non-structural yet created to fulfill well established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an allowing Act, insofar as it approves the owner of a residential or commercial property the legal right to undertake particular works that may otherwise make up trespass or problem.

It also looks for to safeguard the interests of adjacent owners from any potentially unfavorable effects that such works might have by enforcing a requirement that all adjacent owners be given prior notice of them.

In addition, the Act provides for a necessary conflict resolution treatment moderated by a statutorily selected surveyor or surveyors if neighbouring owners have issues about the application of any proposal so alerted.

Particularly, such notice must be served where the owner of a property (referred to as ‘the building owner’) intends to carry out any building work described in Sections 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is restricted to the following:

The information that Sees need to provide in regard of works covered the above areas is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas but the requirements of a Notification associating with Section 2 works is set out in Area 3 of the Act. It is essential to note that the validity of any notification not offering all the relevant information or served in the incorrect way, could be available to challenge in Court.

There is no basic kind of Notice although many individuals use those published by the RICS or variations added to the explanatory booklet released by the Department for Communities and Local Government. However, supplied all the information needed by the pertinent area of the Act exists, an easy letter would be equally legitimate.

Depending on the circumstances of any provided project there might be more than one adjacent owner on whom discover needs to be served in regard of the very same work and, when it comes to deep excavations, an Adjacent Owner may be besides an instant neighbour. It is always more effective to go over the desired deal with adjoining owners prior to serving them with formal written notice – a proposition well explained may minimize issues sufficient to prevent a disagreement emerging and prevent the necessity to designate surveyors.

There are 2 exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The government’s explanatory booklet says that some deal with a party wall may be so small that service of notification under the Act would be typically considered as not required and give as examples works not likely to impact the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support shelves, kitchen area cabinets, and so forth.
  2. Functions under Area 2 of the Act offered that written approval is acquired from all Adjacent Owners and Occupiers prior to work commences.

The 3 kinds of Notice are known, respectively as:

A party structure notification must be served at least two months before the date on which it is proposed to begin that work. The other 2 notifications must be served at least one month prior to work commencing.

The necessary details which Notices must consist of are as follows:

Most of the pro-forma notifications in use consist of the following details as a matter of course despite the kind of notification:

Area 10 of the Act specifies that where an adjoining owner does not authorization in writing to works alerted by the structure owner under Areas 3 and 6, both celebrations should either settle on the consultation of a single surveyor to act for both of them (referred to as the Agreed Surveyor), or each appoint their own property surveyor, to figure out by award matters in dispute in between the celebrations.

Where a job is straightforward, this may only include factor to consider of the time and manner in which those works are to be performed. In more complex schemes, believed will need to be given to a commensurately greater number of elements and undoubtedly appointed property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The very same procedure is utilized to solve any subsequent disagreements between neighbouring owners that may develop in relation to the alerted works, consisting of any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory procedure. A conflict can occur by an adjoining owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter occurring out of or incidental to the works – the ways of making that objection are trivial, but if he stays silent, neither dissenting nor consenting for a period of 2 week after having actually been served with a Notice under either Section 3 or Area 6, the Act considers a dissent to have actually emerged in any event.

There is no considered dissent arrangement in Area 1 of the Act. A valid dispute can still emerge, and property surveyors be selected in accordance with Area 10, in respect of works informed under that area however just as concerns real dissent on specific premises. An adjacent owner’s factors for challenging Area 2 and Section 6 works are hardly ever specified prior to the appointment of surveyors and in a lot of cases not even then.

Where dissent has actually arisen, whether real or deemed, both owners are legally obliged to designate an agreed property surveyor or, if they can not collectively settle on a bachelor, a property surveyor each and if asked for to make such a visit by the other party, should do so within 10 days of the request being served. Failure to comply, immediately provides the owner making the demand the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where 2 surveyors are appointed, they are required to agree upon the selection, in writing, of a 3rd property surveyor who may be hired by either of the surveyors or either of the celebrations to identify the disputed matters and make the necessary award. The 3rd property surveyor is never ever designated by anyone however the Act gives the individual so selected the very same statutory powers as the two surveyors.

3rd property surveyors are most commonly called upon where the two surveyors have reached a deadlock in their deliberations over some particular point and typically this can be in respect on the reasonableness of the charges of the surveyor selected by the adjoining owner. Rarely will a third property surveyor be asked to draw up an award in respect of the whole works however might accompany one or other of the two surveyors to do so if the need occurs.

There is no definition of who can be a surveyor, but it ought to not be the same individual that will supervise the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and examination of the works to make sure that they abide by the works, and who will spend for the works. They will generally be needed to pay the costs and the expense of the works if the work is entirely for the benefit of the structure owner.

If they disagree with the award, celebrations have 14 days to appeal to the county court.

The Act enables access to the adjoining residential or commercial property for the functions of performing the works whether the adjoining owner permits or not, however they must be provided 2 week notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 indicates that from 6 April 2016, notifications and other documents can be served by electronic communications.

The information that Sees should provide in regard of works covered the above areas is different in each case. The requirements of Area 1 and Area 6 Notices are set out in those sections but the requirements of a Notice relating to Area 2 works is set out in Section 3 of the Act. A valid conflict can still arise, and property surveyors be appointed in accordance with Section 10, in respect of works alerted under that area but only as regards real dissent on specific grounds. An adjacent owner’s factors for disputing Area 2 and Section 6 works are hardly ever specified prior to the appointment of property surveyors and in many cases not even then.

Where dissent has occurred, whether actual or considered, both owners are legally obliged to designate an agreed property surveyor or, if they can not collectively agree on a single person, a surveyor each and if requested to make such an appointment by the other party, must do so within 10 days of the request being served.