Faulkners Surveyors As certified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect necessary to encourage upon and resolve Party Wall problems, such as:

  • Preparing and serving legitimate Party Wall Notices
  • Acting as the Structure Owners Party Wall Surveyor
  • Acting as the Adjoining Owners Party Wall Property Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Carrying out and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are specialists and work in accordance with the guidelines set down by the Faculty of Party Wall Surveyors.

The Party Wall Act etc. 1996 is law, failure to adhere to this legislation may lead to works being unlawful.

Party Wall (WikiPedia)

A party wall (periodically parti-wall or parting wall surface, additionally called usual wall or as a demising wall surface) is a separating dividers in between two adjacent structures that is shared by the residents of each residence or organization. Typically, the builder lays the wall surface along a building line separating two terraced residences, to ensure that one fifty percent of the wall surface’s density rests on each side. This sort of wall is typically structural. Celebration wall surfaces can also be created by two abutting wall surfaces constructed at different times. The term can be also used to explain a division between different units within a multi-unit home facility. Extremely often the wall in this case is non-structural however made to satisfy well established standards for noise and/or fire security, i.e. a firewall program.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it grants the owner of a property the legal right to carry out certain works that may otherwise make up trespass or nuisance.

Nevertheless, it also looks for to secure the interests of adjoining owners from any potentially unfavorable impacts that such works might have by imposing a requirement that all adjoining owners be offered prior notification of them.

In addition, the Act attends to an obligatory disagreement resolution procedure mediated by a statutorily designated property surveyor or property surveyors if neighbouring owners have issues about the execution of any proposal so alerted.

Particularly, such notice should be served where the owner of a property (called ‘the structure owner’) means to undertake any building work explained in Sections 1, 2 and 6 of the Act. Note that it is just those works that are covered by the Act and the scope is restricted to the following:

The details that Sees need to supply in regard of works covered the above sections is different in each case. The requirements of Area 1 and Section 6 Notifications are set out in those areas but the requirements of a Notice associating with Area 2 works is set out in Area 3 of the Act. It is important to note that the validity of any notification not offering all the pertinent details or served in the inaccurate manner, could be open up to challenge in Court.

There is no basic kind of Notification although lots of people utilize those published by the RICS or variations appended to the explanatory brochure provided by the Department for Communities and City Government. Offered all the info needed by the relevant area of the Act is present, a basic letter would be equally valid.

Depending upon the circumstances of any provided job there might be more than one adjacent owner on whom notice requirements to be served in respect of the same work and, when it comes to deep excavations, an Adjoining Owner might be aside from an immediate neighbour. It is constantly more suitable to discuss the intended works with adjoining owners before serving them with official written notice – a proposal well discussed might relieve issues sufficient to prevent a disagreement developing and prevent the requirement to select property surveyors.

There are two exceptions where the need to serve notice might be prevented:

  1. De minimis works: The government’s explanatory pamphlet says that some deal with a party wall might be so minor that service of notification under the Act would be generally regarded as not necessary and give as examples works unlikely to affect the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support shelves, kitchen cabinets, and so forth.
  2. Works under Area 2 of the Act offered that written authorization is obtained from all Adjoining Owners and Occupiers prior to work commences.

The three types of Notice are known, respectively as:

A party structure notice should be served a minimum of 2 months prior to the date on which it is proposed to start that work. The other 2 notices must be served a minimum of one month prior to work starting.

The compulsory details which Sees should consist of are as follows:

The majority of the pro-forma notices in use consist of the following information as a matter of course no matter the type of notification:

Section 10 of the Act stipulates that where an adjacent owner does not approval in writing to works notified by the structure owner under Sections 3 and 6, both parties must either settle on the appointment of a single property surveyor to act for both of them (called the Agreed Surveyor), or each designate their own surveyor, to identify by award matters in dispute between the celebrations.

Where a task is straightforward, this might just involve factor to consider of the time and way in which those works are to be carried out. In more complex plans, believed will have to be offered to a commensurately greater number of elements and certainly selected property surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The exact same procedure is used to resolve any subsequent disagreements between neighbouring owners that may develop in relation to the notified works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not halt the statutory process. A dispute can emerge by an adjoining owner actively dissenting, that is, communicating to the building owner an objection in respect of some matter occurring out of or incidental to the works – the methods of making that objection are trivial, but if he stays silent, neither dissenting nor consenting for a period of 2 week after having actually been served with a Notification under either Section 3 or Section 6, the Act deems a dissent to have actually arisen in any event.

There is no deemed dissent provision in Section 1 of the Act. A valid disagreement can still arise, and surveyors be designated in accordance with Area 10, in respect of works notified under that area but only as relates to real dissent on specific grounds. An adjacent owner’s reasons for contesting Area 2 and Area 6 works are seldom specified prior to the appointment of surveyors and in most cases not even then.

Where dissent has arisen, whether actual or deemed, both owners are lawfully obliged to designate a concurred property surveyor or, if they can not collectively settle on a bachelor, a surveyor each and if asked for to make such an appointment by the other party, should do so within 10 days of the demand being served. Failure to comply, immediately gives the owner making the demand the statutory authority to select a surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two surveyors are designated, they are required to agree upon the selection, in composing, of a third property surveyor who may be called upon by either of the property surveyors or either of the parties to figure out the challenged matters and make the required award. The third property surveyor is never ever selected by anybody however the Act provides the individual so chose the same statutory powers as the two surveyors.

Third property surveyors are most commonly called upon where the two property surveyors have actually reached a deadlock in their deliberations over some specific point and frequently this can be in respect on the reasonableness of the fees of the property surveyor selected by the adjacent owner. Rarely will a third surveyor be asked to prepare an award in regard of the entire works however may accompany one or other of the two property surveyors to do so if the need develops.

There is no meaning of who can be a surveyor, however it must not be the same individual that will supervise the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and examination of the works to ensure that they adhere to the works, and who will spend for the works. They will normally be needed to pay the charges and the expense of the works if the work is entirely for the advantage of the building owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act permits access to the adjoining property for the purposes of performing the works whether the adjoining owner gives permission or not, nevertheless they need to be provided 14 days notice.

NB: The introduction of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 suggests that from 6 April 2016, notices and other files can be served by electronic interactions.

The details that Observes should offer in respect of works covered the above sections is different in each case. The requirements of Section 1 and Area 6 Notices are set out in those areas however the requirements of a Notice relating to Area 2 works is set out in Section 3 of the Act. A valid dispute can still emerge, and property surveyors be designated in accordance with Section 10, in respect of works informed under that area however only as relates to real dissent on particular grounds. An adjacent owner’s reasons for challenging Area 2 and Area 6 works are seldom defined prior to the consultation of surveyors and in numerous cases not even then.

Where dissent has actually developed, whether real or deemed, both owners are lawfully obliged to designate a concurred property surveyor or, if they can not jointly agree on a single person, a surveyor each and if asked for to make such a consultation by the other party, must do so within 10 days of the demand being served.