Faulkners Surveyors is a reputable and expert company of party wall surveyors in Inverness, specialising in all party wall matters in Inverness and the Home Counties. The company was founded in 2010 with the coming together of 3 independent skilled Surveyors who specialise in this niché area of surveying.
Do I need a party wall agreement in Inverness?
When do you require a party wall notice or party wall agreement (technically called a party wall award)? Our guide provides you all the answers you need to get the correct authorizations to carry out your structure works. And, if you need one, how to discover a party wall surveyor.
When do I need a party wall agreement?
- A party wall is the shared wall, generally in between a balcony or semi-detached house, and divides the houses of two different owners
- It likewise consists of garden walls developed over a border and excavations near to a neighbour’s home (within 3 or 6 meters, depending on the depth of the brand-new foundations).
- In the house, Party Wall Agreements are most frequently needed for developing works that include loft conversions, the insertion of damp evidence courses and the digging of brand-new foundations (as would be required in developing an extension).
Getting approval for party wall structure works.
- Before party wall structure works can start, the house owner (Building Owner) needs a composed Party Wall Agreement from all impacted neighbours (Adjacent Owners).
- Or a property surveyor has to be selected to prepare a Party Wall Award (the agreed document outlining how the works should advance). Immediately find certified regional Party Wall Surveyors with our totally free Party Wall Surveyor service.
- To start this procedure, the house owner has to serve a Party Wall Notice on their neighbours, in composing, about the prepared party wall works.
Serving a party wall notice.
Serving notice can be done for complimentary, using suitable standard kinds or by a party wall surveyor for a flat fee. A letter of acknowledgement for the neighbour to return and finish is typically consisted of.
A homeowner has to give 2 months written notice on building works which impact a party wall or limit, or one month’s notice for excavations.
Planning approval is not needed to serve a Party Wall notice, and once notification has actually been served, the property owner has up to a year to begin work.
Gaining assent.
Once notification is served, a neighbour has fourteen days to react, after which, there are 3 possible outcomes:.
i) The neighbour gives assent in composing offering the property owner will put right any issues.
- In such simple cases, there is no need to appoint a party wall surveyor or have a Party Wall Award.
- The house owner needs to take dated pictures of the party wall and ideally have agreed composed notes of any fractures, with copies for both.
- Or a surveyor could be designated to prepare a schedule and examine of condition to reduce the risk of disagreements later. This must be done shortly before the work starts.
Dissent.
ii) If the neighbour dissents (or if they do not NOT respond within 14 days, in which case, they are presumed to have actually dissented), a Party Wall Award is needed.
- In this case, both homeowner and neighbour can designate ONE Concurred Surveyor, usually within 10 days, who can act impartially for both.
- The agreed surveyor needs to be independent and NOT the exact same property surveyor the homeowner might be utilizing for their own works. Otherwise their neighbour is not likely to see the property surveyor as neutral.
- The Agreed Property surveyor produces an “Award” which details the works proposed and a schedule of condition, including images, of the neighbour’s house.
- Surveyors’ rates vary between ₤ 150.00 and ₤ 200.00 per hour and a party wall award and property surveyor expenses around ₤ 1000.00.
- Some designers are likewise able to serve as surveyors.
iii) Each owner designates their own surveyor. This is pricey for the property owner who is accountable for the costs of their neighbour’s surveyor as well as their own.
It is important that all these options available to the neighbour, are described clearly in the notification.
Maintaining excellent relationships with your neighbours.
- Before publishing a Party Wall notice through your neighbour’s letterbox, which can appear intimidating, have a friendly chat.
- A shared cup of tea promotes good will and eases fears. It is a chance to show sketches and explain the planned works. It is worthwhile including that an official notice will be sent out later.
- It is reasonable for your neighbour to request the contact information of your surveyor and/or building company for additional details and peace of mind.
Typical mistakes.
i) not offering appropriate notice.
If you live in a terraced house, neighbours on both sides might be affected depending on the works. A property owner living next to flats, might need to serve notice on a number of different people.
iii) not describing the proposed work exactly enough or not consisting of enough info. Notices about excavations, for example, need to consist of full structural details.
iv) not utilizing the requirement, or incorrect form of notification. The type of notice for excavating structures is different from a party wall.
One structure task may require more than one type of notification served on each impacted neighbour.
Timeline.
Two months and one day later on: building works can start, presuming the party wall award has actually been agreed.
One year and one day later: building works should have begun.
Find a party wall surveyor.
Utilize our totally free tool to discover a regional party wall surveyor and compare quotes.
When do you require a party wall notice or party wall agreement (technically called a party wall award)? And, if you need one, how to discover a party wall surveyor.
It is beneficial adding that an official notification will be sent later.
If you live in a terraced home, neighbours on both sides might be affected depending on the works. A property owner living next to flats, might need to serve notification on a number of various people.
Current Weather at Inverness
Related Articles
Learn More about Party Wall
A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.
Our Office Location in Inverness
Learning Videos
Our Social Networks
Around The Web