We are completely qualified expert Party Wall Surveyors with years of experience producing Schedule of Condition reports and legally serving Party Wall Agreements and Notices.

With workplaces in Central, South and North London it makes us completely put to serve Greater London and the surrounding counties.

Whether you’re a Building Owner planning a new project or a neighbour who has actually been served a Party Wall Notice our understanding and experience guarantees we are always best prepared to help with your Party Wall requirements.

Call now and talk to a Specialist Surveyor for friendly professional suggestions.

Party Wall (WikiPedia)

A party wall (sometimes parti-wall or parting wall surface, likewise called common wall or as a demising wall) is a dividing dividers between two adjacent buildings that is shared by the residents of each home or company. Generally, the home builder lays the wall along a residential or commercial property line separating two terraced residences, to ensure that one fifty percent of the wall surface’s thickness pushes each side. This type of wall is generally architectural. Party walls can additionally be created by 2 abutting wall surfaces developed at different times. The term can be likewise used to describe a department between separate devices within a multi-unit apartment building. Really frequently the wall in this instance is non-structural yet created to satisfy well-known criteria for audio and/or fire protection, i.e. a firewall software.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is a making it possible for Act, insofar as it approves the owner of a property the legal right to undertake specific works that may otherwise make up trespass or annoyance.

It also looks for to protect the interests of adjoining owners from any possibly unfavorable effects that such works might have by enforcing a requirement that all adjoining owners be provided prior notice of them.

In addition, the Act offers a mandatory disagreement resolution treatment moderated by a statutorily designated surveyor or property surveyors if neighbouring owners have concerns about the application of any proposal so notified.

Particularly, such notification needs to be served where the owner of a home (referred to as ‘the structure owner’) intends to undertake any building and construction work described in Sections 1, 2 and 6 of the Act. Keep in mind that it is just those works that are covered by the Act and the scope is restricted to the following:

The info that Observes should offer in respect of works covered the above areas is various in each case. The requirements of Area 1 and Area 6 Notifications are set out in those sections but the requirements of a Notification connecting to Area 2 works is set out in Section 3 of the Act. It is essential to keep in mind that the credibility of any notice not supplying all the pertinent info or served in the incorrect way, could be available to challenge in Court.

There is no standard type of Notice although lots of people use those published by the RICS or versions appended to the explanatory brochure provided by the Department for Communities and City Government. Supplied all the info required by the pertinent section of the Act is present, an easy letter would be equally legitimate.

Depending upon the situations of any offered task there might be more than one adjoining owner on whom see requirements to be served in regard of the same work and, when it comes to deep excavations, an Adjoining Owner might be besides an immediate neighbour. It is constantly more suitable to discuss the intended deal with adjoining owners prior to serving them with formal composed notice – a proposition well explained may reduce concerns adequate to prevent a dispute developing and prevent the necessity to appoint surveyors.

There are 2 exceptions where the need to serve notice may be prevented:

  1. De minimis works: The government’s explanatory pamphlet states that some deal with a party wall may be so minor that service of notification under the Act would be usually considered not necessary and give as examples works not likely to impact the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support shelves, cooking area cabinets, and so on.
  2. Works under Section 2 of the Act provided that written authorization is acquired from all Adjacent Owners and Occupiers prior to work commences.

The three types of Notice are known, respectively as:

A party structure notice must be served at least two months before the date on which it is proposed to start that work. The other two notices need to be served at least one month prior to work beginning.

The mandatory information which Notices must consist of are as follows:

Most of the pro-forma notices in use include the following information as a matter of course no matter the type of notification:

Section 10 of the Act specifies that where an adjacent owner does not authorization in writing to works informed by the building owner under Sections 3 and 6, both celebrations need to either agree on the appointment of a single surveyor to act for both of them (called the Agreed Surveyor), or each select their own surveyor, to determine by award matters in dispute between the celebrations.

Where a task is straightforward, this might just include factor to consider of the time and manner in which those works are to be performed. In more complex schemes, thought will need to be provided to a commensurately greater number of elements and undoubtedly appointed surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The exact same procedure is used to deal with any subsequent disputes between neighbouring owners that may develop in relation to the notified works, including any loss or damage suffered by an adjoining owner as a result of their execution.

Inaction on the part of the adjacent owner does not stop the statutory procedure. A conflict can arise by an adjacent owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter arising out of or incidental to the works – the ways of making that objection are not important, however if he stays quiet, neither dissenting nor consenting for a duration of 2 week after having been served with a Notification under either Section 3 or Area 6, the Act considers a dissent to have actually developed in any event.

There is no deemed dissent provision in Area 1 of the Act. A valid disagreement can still occur, and surveyors be appointed in accordance with Section 10, in respect of works alerted under that section but only as regards real dissent on particular grounds. An adjacent owner’s factors for challenging Section 2 and Section 6 works are hardly ever specified prior to the appointment of surveyors and oftentimes not even then.

Where dissent has developed, whether real or deemed, both owners are legally obliged to appoint an agreed property surveyor or, if they can not jointly agree on a bachelor, a surveyor each and if asked for to make such an appointment by the other party, should do so within 10 days of the request being served. Failure to comply, instantly provides the owner making the request the statutory authority to designate a surveyor on behalf of the recalcitrant party. This treatment is set out in area 10( 4) of the Act.

Where two surveyors are selected, they are required to agree upon the choice, in composing, of a 3rd property surveyor who might be hired by either of the property surveyors or either of the celebrations to determine the challenged matters and make the needed award. The third surveyor is never selected by anyone but the Act offers the individual so selected the exact same statutory powers as the two property surveyors.

Third surveyors are most frequently hired where the two property surveyors have actually reached a deadlock in their considerations over some particular point and often this can be in respect on the reasonableness of the costs of the surveyor selected by the adjoining owner. Seldom will a third property surveyor be asked to prepare an award in regard of the whole works but might accompany one or other of the two property surveyors to do so if the need emerges.

There is no meaning of who can be a surveyor, however it should not be the same individual that will monitor the works.

The award will set out the works that can be performed, who will pay the costs for the preparation of the award and inspection of the works to ensure that they abide by the works, and who will spend for the works. If the work is entirely for the benefit of the structure owner, then they will typically be required to pay the charges and the cost of the works.

Celebrations have 14 days to interest the county court if they disagree with the award.

The Act permits access to the adjoining home for the functions of carrying out the works whether the adjoining owner allows or not, nevertheless they must be offered 14 days notice.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 suggests that from 6 April 2016, notifications and other documents can be served by electronic communications.

The info that Discovers must offer in regard of works covered the above areas is various in each case. The requirements of Section 1 and Area 6 Notices are set out in those sections but the requirements of a Notification relating to Section 2 works is set out in Section 3 of the Act. A valid conflict can still emerge, and surveyors be designated in accordance with Section 10, in respect of works notified under that section but only as regards actual dissent on particular grounds. An adjoining owner’s reasons for challenging Area 2 and Section 6 works are seldom specified prior to the visit of surveyors and in lots of cases not even then.

Where dissent has actually occurred, whether actual or considered, both owners are legally required to select an agreed property surveyor or, if they can not jointly concur on a single individual, a property surveyor each and if asked for to make such an appointment by the other party, need to do so within 10 days of the request being served.