We are totally certified expert Party Wall Surveyors with years of experience producing Schedule of Condition reports and legally serving Party Wall Agreements and Notices.

With offices in Central, South and North London it makes us perfectly placed to serve Greater London and the surrounding counties.

Whether you’re a Building Owner preparing a new task or a neighbour who has actually been served a Party Wall Notice our understanding and experience guarantees we are constantly best prepared to help with your Party Wall requirements.

Call now and talk to a Specialist Surveyor for friendly professional recommendations.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it grants the owner of a residential or commercial property the legal right to carry out certain works that may otherwise constitute trespass or problem.

It likewise seeks to safeguard the interests of adjacent owners from any possibly unfavorable impacts that such works may have by imposing a requirement that all adjacent owners be given prior notice of them.

In addition, the Act offers an obligatory disagreement resolution procedure mediated by a statutorily appointed surveyor or surveyors if neighbouring owners have concerns about the execution of any proposal so alerted.

Specifically, such notification should be served where the owner of a property (referred to as ‘the structure owner’) intends to undertake any construction work explained in Sections 1, 2 and 6 of the Act. Note that it is just those works that are covered by the Act and the scope is limited to the following:

The information that Sees need to offer in regard of works covered the above areas is various in each case. The requirements of Section 1 and Area 6 Notifications are set out in those sections however the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. It is very important to keep in mind that the validity of any notification not providing all the relevant details or served in the inaccurate way, could be open to challenge in Court.

There is no standard type of Notification although many people utilize those published by the RICS or versions appended to the explanatory booklet issued by the Department for Communities and City Government. However, provided all the information needed by the appropriate area of the Act exists, a simple letter would be equally valid.

Depending upon the scenarios of any provided task there might be more than one adjoining owner on whom see requirements to be served in respect of the same work and, when it comes to deep excavations, an Adjoining Owner may be aside from an instant neighbour. It is always more suitable to go over the desired works with adjacent owners prior to serving them with official written notice – a proposal well described may minimize issues adequate to prevent a conflict occurring and avoid the necessity to select surveyors.

There are two exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The federal government’s explanatory booklet states that some deal with a party wall might be so small that service of notification under the Act would be usually considered as not needed and give as examples works unlikely to impact the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support shelves, cooking area cabinets, and the like.
  2. Functions under Section 2 of the Act offered that composed authorization is acquired from all Adjoining Owners and Occupiers before work commences.

The 3 kinds of Notification are known, respectively as:

A party structure notification should be served at least two months prior to the date on which it is proposed to begin that work. The other two notices should be served at least one month prior to work starting.

The compulsory info which Sees need to consist of are as follows:

Most of the pro-forma notices in use consist of the following details as a matter of course regardless of the kind of notification:

Area 10 of the Act states that where an adjoining owner does not approval in writing to works notified by the building owner under Areas 3 and 6, both celebrations must either agree on the appointment of a single surveyor to act for both of them (called the Agreed Property Surveyor), or each appoint their own property surveyor, to determine by award matters in dispute between the parties.

Where a task is straightforward, this may just include factor to consider of the time and manner in which those works are to be performed. In more complex plans, thought will need to be offered to a commensurately greater number of factors and certainly designated property surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The same treatment is utilized to fix any subsequent disagreements in between neighbouring owners that may emerge in relation to the informed works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjoining owner does not stop the statutory process. A conflict can develop by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in respect of some matter arising out of or incidental to the works – the ways of making that objection are trivial, however if he stays quiet, neither dissenting nor consenting for a period of 14 days after having been served with a Notice under either Area 3 or Section 6, the Act considers a dissent to have developed in any event.

There is no considered dissent arrangement in Area 1 of the Act. A legitimate dispute can still emerge, and property surveyors be appointed in accordance with Area 10, in regard of works notified under that section however only as relates to real dissent on particular grounds. An adjacent owner’s reasons for contesting Area 2 and Section 6 works are hardly ever specified prior to the consultation of property surveyors and in a lot of cases not even then.

Where dissent has developed, whether real or considered, both owners are lawfully obliged to select a concurred property surveyor or, if they can not collectively agree on a single person, a property surveyor each and if requested to make such a consultation by the other party, must do so within 10 days of the demand being served. Failure to comply, automatically provides the owner making the demand the statutory authority to designate a surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where 2 surveyors are selected, they are obliged to agree upon the selection, in composing, of a 3rd property surveyor who might be hired by either of the property surveyors or either of the celebrations to figure out the disputed matters and make the essential award. The third property surveyor is never ever appointed by anybody however the Act offers the individual so selected the very same statutory powers as the two surveyors.

3rd property surveyors are most typically hired where the two surveyors have reached an impasse in their deliberations over some particular point and typically this can be in respect on the reasonableness of the charges of the surveyor appointed by the adjoining owner. Hardly ever will a 3rd property surveyor be asked to draw up an award in regard of the entire works however may accompany one or other of the two surveyors to do so if the requirement emerges.

There is no meaning of who can be a surveyor, but it needs to not be the same individual that will monitor the works.

The award will set out the works that can be performed, who will pay the costs for the preparation of the award and evaluation of the works to ensure that they abide by the works, and who will pay for the works. They will typically be required to pay the charges and the cost of the works if the work is exclusively for the advantage of the building owner.

Parties have 14 days to appeal to the county court if they disagree with the award.

The Act permits access to the adjoining property for the functions of carrying out the works whether the adjacent owner allows or not, nevertheless they should be provided 2 week notice.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notices and other documents can be served by electronic communications.

The details that Discovers must offer in respect of works covered the above areas is different in each case. The requirements of Section 1 and Area 6 Notifications are set out in those areas but the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. A legitimate conflict can still emerge, and property surveyors be appointed in accordance with Area 10, in regard of works alerted under that area however just as concerns real dissent on specific premises. An adjoining owner’s reasons for challenging Section 2 and Section 6 works are rarely specified prior to the appointment of surveyors and in numerous cases not even then.

Where dissent has actually developed, whether real or deemed, both owners are lawfully required to designate a concurred property surveyor or, if they can not collectively agree on a single individual, a property surveyor each and if requested to make such a consultation by the other party, must do so within 10 days of the request being served.