Faulkners Surveyors As qualified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every aspect necessary to advise upon and fix Party Wall issues, such as:

  • Preparing and serving legitimate Party Wall Notices
  • Acting as the Building Owners Party Wall Property Surveyor
  • Acting as the Adjoining Owners Party Wall Property Surveyor
  • Acting as the Agreed Party Wall Property Surveyor
  • Undertaking and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are specialists and operate in accordance with the guidelines set down by the Professors of Party Wall Surveyors.

The Party Wall Act and so on 1996 is law, failure to adhere to this legislation might result in works being unlawful.

Party Wall (WikiPedia)

Usually, the contractor lays the wall surface along a home line separating two terraced houses, so that one fifty percent of the wall surface’s density lies on each side. This kind of wall surface is usually architectural. Party wall surfaces can additionally be developed by 2 abutting walls constructed at different times.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an enabling Act, insofar as it approves the owner of a home the legal right to carry out certain works that may otherwise make up trespass or nuisance.

It likewise looks for to protect the interests of adjoining owners from any potentially unfavorable effects that such works might have by enforcing a requirement that all adjacent owners be offered prior notification of them.

In addition, the Act attends to a necessary dispute resolution procedure mediated by a statutorily designated property surveyor or surveyors if neighbouring owners have concerns about the application of any proposition so notified.

Particularly, such notification must be served where the owner of a home (called ‘the structure owner’) means to carry out any construction work explained in Sections 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is limited to the following:

The info that Notices must supply in respect of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections but the requirements of a Notification connecting to Area 2 works is set out in Section 3 of the Act. It is necessary to keep in mind that the credibility of any notice not offering all the pertinent info or served in the incorrect manner, could be open up to challenge in Court.

There is no basic form of Notice although many people utilize those published by the RICS or variations appended to the explanatory pamphlet provided by the Department for Communities and Local Government. However, offered all the info needed by the appropriate section of the Act exists, an easy letter would be similarly valid.

Depending on the circumstances of any given project there might be more than one adjacent owner on whom notice requirements to be served in respect of the same work and, when it comes to deep excavations, an Adjoining Owner may be besides an immediate neighbour. It is constantly preferable to go over the designated works with adjoining owners before serving them with official written notification – a proposal well described might ease concerns adequate to prevent a conflict emerging and prevent the requirement to designate property surveyors.

There are 2 exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The government’s explanatory pamphlet states that some deal with a party wall may be so minor that service of notification under the Act would be usually considered not needed and give as examples works not likely to affect the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support racks, cooking area cabinets, and the like.
  2. Works under Section 2 of the Act offered that composed permission is obtained from all Adjoining Owners and Occupiers before work commences.

The three kinds of Notice are understood, respectively as:

A party structure notice need to be served at least 2 months before the date on which it is proposed to begin that work. The other two notifications must be served a minimum of one month prior to work starting.

The obligatory information which Sees must contain are as follows:

Most of the pro-forma notices in use consist of the following info as a matter of course no matter the type of notice:

Area 10 of the Act specifies that where an adjoining owner does not permission in writing to works notified by the building owner under Areas 3 and 6, both celebrations should either settle on the visit of a single surveyor to act for both of them (known as the Agreed Property Surveyor), or each appoint their own property surveyor, to figure out by award matters in dispute in between the parties.

Where a job is straightforward, this might only include factor to consider of the time and manner in which those works are to be performed. In more complex plans, believed will have to be offered to a commensurately greater number of elements and indeed appointed property surveyors have the statutory jurisdiction to make an award in regard of any matter connected with any work to which the act relates.

The very same procedure is utilized to deal with any subsequent disagreements in between neighbouring owners that may occur in relation to the alerted works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not stop the statutory process. A disagreement can emerge by an adjoining owner actively dissenting, that is, interacting to the structure owner an objection in respect of some matter occurring out of or incidental to the works – the methods of making that objection are trivial, but if he remains silent, neither dissenting nor consenting for a duration of 14 days after having been served with a Notification under either Area 3 or Section 6, the Act considers a dissent to have developed in any event.

There is no considered dissent provision in Area 1 of the Act. A valid disagreement can still emerge, and property surveyors be designated in accordance with Area 10, in regard of works notified under that area however just as regards actual dissent on specific premises. An adjoining owner’s factors for challenging Section 2 and Area 6 works are seldom defined prior to the visit of surveyors and oftentimes not even then.

Where dissent has actually developed, whether real or deemed, both owners are lawfully obliged to designate a concurred surveyor or, if they can not collectively agree on a single person, a surveyor each and if requested to make such a visit by the other party, need to do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the demand the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two property surveyors are designated, they are obliged to agree upon the choice, in composing, of a 3rd property surveyor who may be hired by either of the property surveyors or either of the celebrations to identify the disputed matters and make the necessary award. The third property surveyor is never appointed by anybody however the Act provides the individual so chose the same statutory powers as the two property surveyors.

3rd surveyors are most commonly called upon where the two surveyors have reached a deadlock in their considerations over some specific point and frequently this can be in respect on the reasonableness of the costs of the property surveyor designated by the adjoining owner. Seldom will a third surveyor be asked to prepare an award in respect of the entire works but may accompany one or other of the two surveyors to do so if the requirement arises.

There is no meaning of who can be a property surveyor, but it needs to not be the same individual that will supervise the works.

The award will set out the works that can be carried out, who will pay the fees for the preparation of the award and examination of the works to ensure that they comply with the works, and who will pay for the works. They will generally be needed to pay the fees and the cost of the works if the work is entirely for the advantage of the building owner.

Parties have 2 week to interest the county court if they disagree with the award.

The Act enables access to the adjacent home for the functions of performing the works whether the adjoining owner allows or not, however they need to be provided 14 days notification.

NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 indicates that from 6 April 2016, notices and other files can be served by electronic interactions.

The info that Discovers should offer in respect of works covered the above sections is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. A valid dispute can still emerge, and surveyors be appointed in accordance with Section 10, in respect of works informed under that section but just as relates to real dissent on specific grounds. An adjacent owner’s factors for disputing Area 2 and Section 6 works are seldom specified prior to the consultation of property surveyors and in numerous cases not even then.

Where dissent has actually developed, whether real or deemed, both owners are lawfully required to select a concurred property surveyor or, if they can not collectively concur on a single person, a surveyor each and if requested to make such a consultation by the other party, need to do so within 10 days of the request being served.