We are fully qualified specialist Party Wall Surveyors with years of experience producing Arrange of Condition reports and lawfully serving Party Wall Agreements and Notices.

With offices in Central, South and North London it makes us perfectly positioned to serve Greater London and the surrounding counties.

Whether you’re a Structure Owner planning a brand-new project or a neighbour who has actually been served a Party Wall Notice our knowledge and experience ensures we are constantly best prepared to help with your Party Wall requirements.

Call now and talk to a Professional Surveyor for friendly professional suggestions.

Party Wall (WikiPedia)

A party wall (sometimes parti-wall or parting wall surface, additionally understood as usual wall surface or as a demising wall surface) is a dividing dividers in between two adjacent buildings that is shared by the owners of each home or business. Usually, the home builder lays the wall along a home line dividing two terraced houses, so that one fifty percent of the wall surface’s thickness lies on each side. This kind of wall surface is generally structural. Party walls can likewise be formed by two abutting wall surfaces constructed at various times. The term can be also utilized to define a division in between different units within a multi-unit apartment facility. Really commonly the wall surface in this situation is non-structural but created to meet recognized requirements for noise and/or fire defense, i.e. a firewall program.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it approves the owner of a property the legal right to undertake certain works that may otherwise make up trespass or annoyance.

It also seeks to protect the interests of adjacent owners from any possibly adverse effects that such works may have by enforcing a requirement that all adjoining owners be offered prior notification of them.

In addition, the Act offers a mandatory dispute resolution procedure moderated by a statutorily designated property surveyor or surveyors if neighbouring owners have issues about the execution of any proposition so notified.

Particularly, such notice needs to be served where the owner of a residential or commercial property (called ‘the structure owner’) plans to undertake any construction work described in Areas 1, 2 and 6 of the Act. Note that it is just those works that are covered by the Act and the scope is limited to the following:

The information that Sees should offer in regard of works covered the above sections is various in each case. The requirements of Area 1 and Section 6 Notifications are set out in those sections but the requirements of a Notification associating with Section 2 works is set out in Area 3 of the Act. It is essential to note that the credibility of any notice not offering all the appropriate info or served in the inaccurate way, could be open to challenge in Court.

There is no standard form of Notification although many people utilize those published by the RICS or variations appended to the explanatory booklet issued by the Department for Communities and Local Government. Offered all the info required by the relevant area of the Act is present, a basic letter would be equally legitimate.

Depending on the scenarios of any offered project there might be more than one adjacent owner on whom notice requirements to be served in respect of the very same work and, in the case of deep excavations, an Adjoining Owner may be aside from an instant neighbour. It is always more suitable to go over the intended deal with adjoining owners before serving them with formal composed notification – a proposition well discussed might ease issues enough to prevent a conflict arising and prevent the need to appoint property surveyors.

There are two exceptions where the need to serve notice might be prevented:

  1. De minimis works: The government’s explanatory pamphlet states that some works on a party wall may be so minor that service of notification under the Act would be typically regarded as not required and give as examples works not likely to impact the structural strength or support functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or placing power sockets, and screws to support racks, kitchen area cabinets, and so on.
  2. Functions under Section 2 of the Act offered that written approval is obtained from all Adjoining Owners and Occupiers before work commences.

The three kinds of Notice are known, respectively as:

A party structure notification must be served at least two months before the date on which it is proposed to begin that work. The other two notifications should be served at least one month prior to work beginning.

The compulsory info which Observes should include are as follows:

The majority of the pro-forma notifications in use consist of the following details as a matter of course regardless of the kind of notification:

Section 10 of the Act specifies that where an adjoining owner does not consent in writing to works informed by the structure owner under Sections 3 and 6, both celebrations must either agree on the appointment of a single surveyor to act for both of them (called the Agreed Property Surveyor), or each select their own property surveyor, to figure out by award matters in dispute in between the parties.

Where a task is straightforward, this may only include consideration of the time and way in which those works are to be carried out. In more complex plans, thought will need to be offered to a commensurately greater number of aspects and certainly appointed property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The very same procedure is used to resolve any subsequent disagreements in between neighbouring owners that might arise in relation to the notified works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not halt the statutory procedure. A conflict can occur by an adjacent owner actively dissenting, that is, interacting to the building owner an objection in regard of some matter developing out of or incidental to the works – the methods of making that objection are trivial, but if he stays quiet, neither dissenting nor consenting for a period of 14 days after having actually been served with a Notice under either Section 3 or Area 6, the Act considers a dissent to have occurred in any event.

There is no deemed dissent provision in Area 1 of the Act. A legitimate dispute can still arise, and surveyors be selected in accordance with Section 10, in regard of works notified under that area but just as relates to real dissent on particular premises. An adjacent owner’s factors for contesting Area 2 and Area 6 works are hardly ever defined prior to the appointment of surveyors and in most cases not even then.

Where dissent has arisen, whether actual or deemed, both owners are legally obliged to select a concurred surveyor or, if they can not jointly agree on a single person, a property surveyor each and if requested to make such a visit by the other party, must do so within 10 days of the demand being served. Failure to comply, immediately gives the owner making the request the statutory authority to appoint a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where 2 property surveyors are selected, they are obliged to agree upon the choice, in writing, of a 3rd property surveyor who may be hired by either of the surveyors or either of the parties to determine the contested matters and make the needed award. The third property surveyor is never appointed by anyone however the Act gives the person so picked the exact same statutory powers as the two surveyors.

Third property surveyors are most commonly hired where the two property surveyors have actually reached an impasse in their considerations over some particular point and often this can be in respect on the reasonableness of the fees of the property surveyor designated by the adjoining owner. Rarely will a third surveyor be asked to draw up an award in respect of the whole works but might join with one or other of the two surveyors to do so if the need arises.

There is no meaning of who can be a property surveyor, but it needs to not be the same person that will supervise the works.

The award will set out the works that can be performed, who will pay the fees for the preparation of the award and examination of the works to ensure that they comply with the works, and who will spend for the works. They will typically be needed to pay the charges and the cost of the works if the work is exclusively for the advantage of the structure owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act allows access to the adjacent home for the purposes of performing the works whether the adjoining owner permits or not, however they should be provided 2 week notice.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notifications and other files can be served by electronic communications.

The information that Observes need to offer in regard of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notice relating to Area 2 works is set out in Section 3 of the Act. A legitimate dispute can still develop, and property surveyors be selected in accordance with Area 10, in respect of works alerted under that area however just as concerns real dissent on specific premises. An adjoining owner’s factors for disputing Area 2 and Section 6 works are seldom specified prior to the consultation of surveyors and in lots of cases not even then.

Where dissent has actually occurred, whether actual or deemed, both owners are lawfully required to designate a concurred surveyor or, if they can not collectively concur on a single person, a property surveyor each and if requested to make such a visit by the other party, should do so within 10 days of the request being served.