Faulkners Surveyors As certified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every element necessary to advise upon and deal with Party Wall problems, such as:

  • Preparing and serving valid Party Wall Notices
  • Acting as the Building Owners Party Wall Property Surveyor
  • Acting as the Adjoining Owners Party Wall Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Carrying out and preparing Schedules of Condition
  • Preparation and settlement of Party Wall Awards

All our Party Wall Surveyors are professionals and operate in accordance with the regulations set down by the Professors of Party Wall Surveyors.

The Party Wall Act and so on 1996 is law, failure to comply with this legislation might result in works being unlawful.

Party Wall (WikiPedia)

Commonly, the building contractor lays the wall surface along a residential property line dividing two terraced homes, so that one half of the wall’s thickness lies on each side. This type of wall surface is generally structural. Party wall surfaces can additionally be developed by 2 abutting walls built at different times.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is an enabling Act, insofar as it approves the owner of a property the legal right to undertake certain works that may otherwise make up trespass or problem.

It also looks for to secure the interests of adjacent owners from any potentially negative results that such works might have by enforcing a requirement that all adjoining owners be provided prior notice of them.

In addition, the Act offers a mandatory conflict resolution treatment mediated by a statutorily selected property surveyor or property surveyors if neighbouring owners have issues about the execution of any proposition so alerted.

Particularly, such notice must be served where the owner of a property (known as ‘the structure owner’) intends to carry out any building work described in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is limited to the following:

The info that Observes should provide in regard of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those areas however the requirements of a Notification associating with Section 2 works is set out in Section 3 of the Act. It is essential to note that the credibility of any notice not providing all the relevant info or served in the inaccurate way, could be open up to challenge in Court.

There is no standard form of Notification although many people utilize those released by the RICS or variations added to the explanatory pamphlet issued by the Department for Communities and City Government. However, supplied all the details required by the pertinent section of the Act exists, a basic letter would be equally legitimate.

Depending on the scenarios of any provided job there may be more than one adjacent owner on whom notice needs to be served in regard of the same work and, in the case of deep excavations, an Adjacent Owner may be aside from an instant neighbour. It is always preferable to go over the intended deal with adjacent owners prior to serving them with official composed notification – a proposal well described might minimize issues adequate to prevent a conflict developing and prevent the requirement to appoint surveyors.

There are two exceptions where the need to serve notice may be prevented:

  1. De minimis works: The government’s explanatory booklet says that some deal with a party wall might be so small that service of notification under the Act would be usually considered not essential and give as examples works not likely to impact the structural strength or assistance functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support racks, cooking area cupboards, and the like.
  2. Functions under Section 2 of the Act provided that composed approval is obtained from all Adjacent Owners and Occupiers prior to work commences.

The three types of Notification are understood, respectively as:

A party structure notice need to be served at least two months before the date on which it is proposed to start that work. The other 2 notices should be served at least one month prior to work commencing.

The mandatory info which Sees need to include are as follows:

Most of the pro-forma notices in use consist of the following details as a matter of course despite the type of notification:

Section 10 of the Act states that where an adjacent owner does not approval in writing to works informed by the building owner under Areas 3 and 6, both celebrations should either settle on the consultation of a single property surveyor to act for both of them (known as the Agreed Property Surveyor), or each designate their own property surveyor, to identify by award matters in dispute in between the celebrations.

Where a task is straightforward, this may just involve consideration of the time and way in which those works are to be performed. In more complex plans, thought will have to be given to a commensurately greater number of elements and undoubtedly appointed surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The very same procedure is used to resolve any subsequent conflicts in between neighbouring owners that may develop in relation to the notified works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not stop the statutory procedure. A conflict can arise by an adjacent owner actively dissenting, that is, interacting to the structure owner an objection in regard of some matter arising out of or incidental to the works – the methods of making that objection are not important, however if he stays silent, neither dissenting nor consenting for a period of 2 week after having been served with a Notice under either Area 3 or Area 6, the Act deems a dissent to have emerged in any event.

There is no considered dissent provision in Section 1 of the Act. A legitimate conflict can still develop, and property surveyors be selected in accordance with Area 10, in regard of works informed under that area but only as concerns real dissent on specific grounds. An adjacent owner’s factors for contesting Area 2 and Section 6 works are rarely defined prior to the visit of surveyors and in many cases not even then.

Where dissent has actually arisen, whether real or considered, both owners are legally obliged to appoint a concurred property surveyor or, if they can not jointly settle on a single person, a property surveyor each and if requested to make such an appointment by the other party, need to do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the demand the statutory authority to appoint a property surveyor on behalf of the recalcitrant party. This procedure is set out in section 10( 4) of the Act.

Where 2 property surveyors are selected, they are obliged to agree upon the selection, in composing, of a third surveyor who may be called upon by either of the surveyors or either of the parties to identify the challenged matters and make the needed award. The third property surveyor is never ever designated by anybody but the Act gives the individual so chose the same statutory powers as the two property surveyors.

Third surveyors are most frequently hired where the two surveyors have actually reached an impasse in their considerations over some particular point and often this can be in regard on the reasonableness of the fees of the surveyor appointed by the adjoining owner. Seldom will a third property surveyor be asked to draw up an award in respect of the whole works however might accompany one or other of the two surveyors to do so if the need occurs.

There is no meaning of who can be a surveyor, however it ought to not be the same person that will supervise the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and assessment of the works to ensure that they comply with the works, and who will pay for the works. They will normally be needed to pay the costs and the cost of the works if the work is solely for the benefit of the building owner.

Celebrations have 2 week to attract the county court if they disagree with the award.

The Act allows access to the adjacent home for the functions of carrying out the works whether the adjacent owner permits or not, nevertheless they must be given 2 week notification.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notifications and other files can be served by electronic interactions.

The details that Discovers must supply in regard of works covered the above sections is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those areas but the requirements of a Notification relating to Section 2 works is set out in Area 3 of the Act. A legitimate disagreement can still emerge, and property surveyors be appointed in accordance with Area 10, in respect of works notified under that area but only as regards real dissent on specific grounds. An adjacent owner’s factors for contesting Area 2 and Area 6 works are hardly ever defined prior to the appointment of property surveyors and in numerous cases not even then.

Where dissent has arisen, whether actual or deemed, both owners are lawfully obliged to designate a concurred property surveyor or, if they can not jointly concur on a single individual, a property surveyor each and if asked for to make such an appointment by the other party, should do so within 10 days of the request being served.