Faulkners Surveyors As qualified and experienced Party Wall Surveyors we specialise in all Party Wall matters.
We cover every element needed to recommend upon and solve Party Wall issues, such as:

  • Preparing and serving valid Party Wall Notices
  • Acting as the Structure Owners Party Wall Property Surveyor
  • Acting as the Adjoining Owners Party Wall Surveyor
  • Acting as the Agreed Party Wall Surveyor
  • Carrying out and preparing Schedules of Condition
  • Preparation and negotiation of Party Wall Awards

All our Party Wall Surveyors are professionals and operate in accordance with the guidelines set down by the Faculty of Party Wall Surveyors.

The Party Wall Act etc. 1996 is law, failure to adhere to this legislation may lead to works being illegal.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as typical wall or as a demising wall) is a splitting partition in between 2 adjoining buildings that is shared by the residents of each residence or organization. Commonly, the builder lays the wall along a building line separating two terraced homes, so that one fifty percent of the wall surface’s thickness rests on each side. This sort of wall is generally structural. Party wall surfaces can also be created by 2 abutting wall surfaces constructed at different times. The term can be also used to explain a division in between separate devices within a multi-unit house facility. Extremely frequently the wall in this instance is non-structural however designed to satisfy well established requirements for audio and/or fire defense, i.e. a firewall software.

Party Wall

THE PARTY WALL ACT 1996- A NEWBIES GUIDE

We value that many individuals wishing to perform works on their home have the requirements of The Party Wall Act thrust upon at a fairly late phase in the pre-construction process. We also comprehend it can be a complicated process for those that have not experienced it in the past. Here in Faulkners Surveyors, one of our senior surveyors, provides his “novices guide” which aims to offer a summary understanding of party walls and the requirements of the Party Wall Act …

What is the Party Wall Act?

The Party Wall etc Act 1996 offers a procedure to follow when building work includes a party wall or party fence wall, some excavations near to neighbouring structures, and brand-new walls at borders. The Act allows owners to perform certain specific works, consisting of work to the full density of a party wall, whilst at the same time securing the interests of anyone else who might be affected by that work. The Act is developed to avoid or minimise disputes by making sure property owners alert their neighbours in advance of certain proposed works.

The Act provides a mechanism for dealing with disagreements and allowing works to proceed. It likewise needs that, where the adjoining owner does not ‘concur’ in writing to the works, a surveyor or surveyors will figure out the time and way in which those works are carried out.

What is a party wall?

Party walls normally separate structures coming from various owners but might consist of garden walls built astride a limit– called party fence walls. Where a wall separates 2 different size buildings typically only the part that is used by both properties is a party wall, the rest belongs to the person or individuals on whose land it stands.

The “etc” within The Party Wall etc Act 1996 is so included because the arrangements of the Act are not restricted to party walls, they likewise include party structures and party fence walls.

Section 20 of the Act defines each:

” party fence wall” means a wall (not belonging to a structure) which bases on lands of different owners and is used or constructed to be used for separating such adjoining lands, however does not include a wall built on the land of one owner the artificially formed assistance of which tasks into the land of another owner;

” party structure” suggests a party wall and likewise a flooring partition or other structure separating buildings or parts of structures approached exclusively by separate entryways or separate staircases;

What is covered by the Act?

There are particular products of work that you can only be done after notifying the adjacent owners and either getting written contract of the neighbour or with a Party Wall Award prepared by a surveyor/s.

Notifiable works consist of (but are not restricted to):.

Notices are also needed if it is proposed to build a new wall on the line of junction (limit line). A party wall property surveyor will normally be able to verify which work is notifiable and advice the notification duration and kind of notice required.

What is not covered by the Act?

The Act relates only to particular particular types of work and is permissive in nature. It needs to not be viewed as a technique of objecting to or preventing works and it is not intended to be applied to small tasks that do not impact the structural integrity or loading of a party wall.

It is usually concurred that works such as fixing plug sockets, screwing in shelving or replastering walls are minor works and do not require a notification.

Notices.

The workings of the Act are constantly instigated by the of providing notifications. This is the first stage of the process and, without the concern of valid notifications, no additional action can be taken under the arrangement of the Act.

Written notification must be served on adjoining owners a minimum of two months before starting any party wall works (one month for works to the line of junction or excavations). All adjoining owners should be served a notification and there are likely to be instances where there is more than one adjacent property and more than one owner of each residential or commercial property (ie: if the adjacent home is split into flats and owned on a leasehold basis, notifications will be needed to both leaseholder and freeholder of all flats impacted by the works). Works to a party wall, or those affecting a ceiling or floor, will likewise require a notification to adjacent owners living above or below.

Legitimate notices should include the following details as a minimum:.

It is important to include the proper information on a notification as, if they are deemed void, then any subsequent actions are likewise void.

Actions To Notices.

On invoice of a notice, an adjoining owner has three possible strategies:.

If the adjacent does not react within 14 days then a deemed conflict is said to have actually taken place and the person bring out the work needs to select a surveyor to act on the adjacent owners behalf.

If adjoining owners provide composed grant the works as set out within the notices, then there is no disagreement to resolve and no more requirement for party wall surveyors or, certainly, the Party Wall Act. Presuming work profits as detailed within no damage and the notice is caused, then no more participation is required.

Handling Disputes.

The property surveyors then work together to concur the terms under which work may proceed. The property surveyor( s) will review the plans, notices and structural details of the works and, after considering the effect of the works, will draw up an agreement which sets out the terms under which work can be brought out (the Award).

The Party Wall Award.

The award will typically tape-record the condition of the appropriate part of adjoining property before work begins (this is not a requirement under the Act but is considered great practice and is appropriately offered by the majority of good surveyors). The award might likewise give access to both homes so that the works can be safely performed and the surveyor/s can inspect work in development.

Typically, the building owner who began the work pays for all costs of work and the sensible expenses incurred by all celebrations as a result, this will consist of the surveyors costs for both Structure Owner and Adjoining Owner.

We value that lots of people wishing to carry out works on their residential or commercial property have the requirements of The Party Wall Act thrust upon at a relatively late stage in the pre-construction procedure. Here, Michael White C.Build.E MCABE MFPWS, one of our senior property surveyors, provides his “beginners guide” which aims to offer a summary understanding of party walls and the requirements of the Party Wall Act …

What is the Party Wall Act?

The Party Wall etc Act 1996 supplies a treatment to follow when building work includes a party wall or party fence wall, some excavations close to neighbouring structures, and brand-new walls at boundaries. The Act allows owners to bring out particular specific works, including work to the complete density of a party wall, whilst at the very same time securing the interests of anybody else who may be impacted by that work. Composed notification must be served on adjacent owners at least two months before starting any party wall works (one month for works to the line of junction or excavations).