Faulkners Surveyors is an independent company of building property surveyors that specialise in the

Party Wall etc. Act 1996 acting for Building Owners, Adjoining Owners and as the Agreed Property Surveyor throughout London and the Home Counties.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an allowing Act, insofar as it gives the owner of a property the legal right to undertake particular works that might otherwise constitute trespass or nuisance.

It also looks for to safeguard the interests of adjoining owners from any potentially unfavorable results that such works might have by enforcing a requirement that all adjacent owners be offered prior notification of them.

In addition, the Act attends to a mandatory dispute resolution treatment mediated by a statutorily selected property surveyor or property surveyors if neighbouring owners have issues about the implementation of any proposal so alerted.

Particularly, such notification should be served where the owner of a property (referred to as ‘the building owner’) plans to undertake any building work explained in Areas 1, 2 and 6 of the Act. Note that it is only those works that are covered by the Act and the scope is limited to the following:

The info that Notices must provide in respect of works covered the above sections is various in each case. The requirements of Section 1 and Section 6 Notices are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Area 3 of the Act. It is essential to note that the credibility of any notification not supplying all the appropriate details or served in the incorrect way, could be open to challenge in Court.

There is no standard type of Notice although many people utilize those released by the RICS or variations added to the explanatory brochure issued by the Department for Communities and City Government. However, offered all the details required by the relevant section of the Act exists, an easy letter would be equally legitimate.

Depending upon the circumstances of any offered task there might be more than one adjoining owner on whom see requirements to be served in respect of the same work and, when it comes to deep excavations, an Adjoining Owner may be other than an immediate neighbour. It is always preferable to go over the desired deal with adjacent owners prior to serving them with formal written notification – a proposal well explained might minimize issues sufficient to prevent a conflict occurring and avoid the requirement to designate surveyors.

There are two exceptions where the requirement to serve notice might be prevented:

  1. De minimis works: The government’s explanatory brochure states that some deal with a party wall may be so small that service of notification under the Act would be generally considered as not essential and give as examples works not likely to affect the structural strength or support functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support shelves, cooking area cabinets, and so on.
  2. Works under Section 2 of the Act offered that written approval is gotten from all Adjacent Owners and Occupiers prior to work commences.

The three kinds of Notification are understood, respectively as:

A party structure notification should be served a minimum of 2 months prior to the date on which it is proposed to begin that work. The other two notices need to be served at least one month prior to work starting.

The mandatory info which Sees should include are as follows:

The majority of the pro-forma notices in use consist of the following details as a matter of course despite the type of notification:

Area 10 of the Act states that where an adjacent owner does not authorization in writing to works informed by the structure owner under Areas 3 and 6, both parties need to either settle on the visit of a single surveyor to act for both of them (referred to as the Agreed Surveyor), or each select their own property surveyor, to identify by award matters in dispute in between the parties.

Where a job is straightforward, this might just involve factor to consider of the time and way in which those works are to be carried out. In more complex schemes, believed will have to be given to a commensurately greater number of aspects and indeed designated surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The very same treatment is used to fix any subsequent disputes between neighbouring owners that may occur in relation to the notified works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not halt the statutory procedure. A dispute can develop by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in regard of some matter emerging out of or incidental to the works – the means of making that objection are trivial, but if he stays silent, neither consenting nor dissenting for a duration of 2 week after having actually been served with a Notice under either Section 3 or Section 6, the Act considers a dissent to have occurred in any event.

There is no deemed dissent arrangement in Section 1 of the Act. A valid dispute can still develop, and surveyors be selected in accordance with Area 10, in respect of works informed under that section however just as regards actual dissent on specific grounds. An adjoining owner’s factors for challenging Section 2 and Section 6 works are hardly ever defined prior to the appointment of property surveyors and in most cases not even then.

Where dissent has occurred, whether actual or considered, both owners are legally required to designate a concurred surveyor or, if they can not collectively settle on a bachelor, a surveyor each and if asked for to make such an appointment by the other party, must do so within 10 days of the demand being served. Failure to comply, instantly offers the owner making the demand the statutory authority to select a surveyor on behalf of the recalcitrant party. This treatment is set out in area 10( 4) of the Act.

Where 2 property surveyors are designated, they are required to agree upon the choice, in writing, of a third property surveyor who might be called upon by either of the surveyors or either of the parties to determine the challenged matters and make the essential award. The 3rd surveyor is never ever selected by anybody however the Act offers the person so picked the same statutory powers as the two surveyors.

Third property surveyors are most typically hired where the two property surveyors have actually reached an impasse in their considerations over some particular point and frequently this can be in respect on the reasonableness of the costs of the property surveyor designated by the adjoining owner. Seldom will a 3rd property surveyor be asked to prepare an award in respect of the entire works but may join with one or other of the two surveyors to do so if the requirement emerges.

There is no meaning of who can be a surveyor, however it must not be the same individual that will monitor the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and inspection of the works to ensure that they abide by the works, and who will spend for the works. They will generally be required to pay the costs and the expense of the works if the work is solely for the benefit of the structure owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act allows access to the adjoining home for the functions of carrying out the works whether the adjacent owner permits or not, nevertheless they need to be provided 2 week notice.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 implies that from 6 April 2016, notifications and other documents can be served by electronic communications.

The details that Observes should offer in respect of works covered the above areas is various in each case. The requirements of Area 1 and Area 6 Notifications are set out in those areas but the requirements of a Notice relating to Section 2 works is set out in Section 3 of the Act. A valid disagreement can still occur, and surveyors be selected in accordance with Area 10, in regard of works notified under that section however only as concerns real dissent on particular grounds. An adjoining owner’s reasons for disputing Section 2 and Area 6 works are seldom specified prior to the visit of property surveyors and in lots of cases not even then.

Where dissent has emerged, whether real or deemed, both owners are legally required to appoint an agreed surveyor or, if they can not jointly concur on a single individual, a surveyor each and if requested to make such an appointment by the other party, must do so within 10 days of the request being served.