Faulkners Surveyors provide a variety of structure surveying services specialising in Party Wall Services.

We pride ourselves on our flexibility and personal involvement towards our clients requirements. Faulkners Surveyors are a broadening group of surveyors with a wealth of know-how, ability and experience. If you are trying to find a professional yet flexible technique to all your property matters then call Faulkners Surveyors for an informative chat.

Our property surveyors are controlled by the Faculty of Party Wall Surveyors and carry expert indemnity insurance coverage to cover their work.

Party Wall (WikiPedia)

Commonly, the building contractor lays the wall along a residential property line splitting two terraced homes, so that one half of the wall’s density exists on each side. This kind of wall is generally architectural. Party wall surfaces can additionally be formed by 2 abutting wall surfaces developed at various times.

wall party

Party Wall Act

The Party Wall and so on. Act 1996 is a making it possible for Act, insofar as it gives the owner of a home the legal right to undertake certain works that might otherwise make up trespass or problem.

It also seeks to protect the interests of adjacent owners from any potentially unfavorable results that such works may have by enforcing a requirement that all adjoining owners be given prior notification of them.

In addition, the Act provides for a necessary disagreement resolution treatment moderated by a statutorily selected property surveyor or property surveyors if neighbouring owners have issues about the application of any proposal so notified.

Specifically, such notification must be served where the owner of a property (known as ‘the building owner’) plans to carry out any construction work described in Areas 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is restricted to the following:

The info that Discovers must provide in respect of works covered the above sections is different in each case. The requirements of Area 1 and Section 6 Notifications are set out in those sections but the requirements of a Notification connecting to Area 2 works is set out in Area 3 of the Act. It is very important to keep in mind that the validity of any notice not providing all the appropriate info or served in the incorrect way, could be open to challenge in Court.

There is no standard kind of Notice although lots of people use those published by the RICS or variations added to the explanatory booklet provided by the Department for Communities and City Government. Supplied all the details required by the pertinent area of the Act is present, an easy letter would be similarly valid.

Depending upon the scenarios of any offered task there may be more than one adjacent owner on whom see requirements to be served in respect of the same work and, when it comes to deep excavations, an Adjacent Owner may be aside from an immediate neighbour. It is constantly more suitable to talk about the intended works with adjoining owners before serving them with formal composed notice – a proposition well explained might alleviate issues enough to prevent a dispute developing and prevent the requirement to appoint property surveyors.

There are 2 exceptions where the need to serve notice might be prevented:

  1. De minimis works: The federal government’s explanatory brochure states that some deal with a party wall may be so small that service of notice under the Act would be generally considered not essential and give as examples works unlikely to impact the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support shelves, kitchen cupboards, and the like.
  2. Functions under Area 2 of the Act supplied that written authorization is obtained from all Adjoining Owners and Occupiers prior to work commences.

The 3 kinds of Notice are known, respectively as:

A party structure notification must be served at least two months before the date on which it is proposed to start that work. The other two notices need to be served at least one month prior to work beginning.

The obligatory details which Sees should contain are as follows:

Most of the pro-forma notifications in use consist of the following information as a matter of course regardless of the kind of notice:

Section 10 of the Act stipulates that where an adjoining owner does not approval in writing to works informed by the building owner under Sections 3 and 6, both parties must either agree on the visit of a single property surveyor to act for both of them (referred to as the Agreed Surveyor), or each select their own surveyor, to identify by award matters in dispute in between the parties.

Where a job is straightforward, this may only involve factor to consider of the time and way in which those works are to be carried out. In more complex schemes, believed will have to be given to a commensurately greater number of factors and certainly designated property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The same treatment is used to deal with any subsequent disagreements between neighbouring owners that might develop in relation to the alerted works, consisting of any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjoining owner does not halt the statutory process. A disagreement can emerge by an adjoining owner actively dissenting, that is, interacting to the building owner an objection in regard of some matter occurring out of or incidental to the works – the methods of making that objection are trivial, however if he stays quiet, neither dissenting nor consenting for a duration of 14 days after having been served with a Notice under either Area 3 or Area 6, the Act deems a dissent to have developed in any event.

There is no considered dissent arrangement in Area 1 of the Act. A legitimate disagreement can still occur, and surveyors be appointed in accordance with Area 10, in respect of works alerted under that section however just as concerns real dissent on specific premises. An adjacent owner’s reasons for disputing Area 2 and Section 6 works are hardly ever defined prior to the consultation of property surveyors and oftentimes not even then.

Where dissent has actually developed, whether actual or considered, both owners are legally required to designate a concurred property surveyor or, if they can not jointly agree on a bachelor, a surveyor each and if requested to make such a consultation by the other party, need to do so within 10 days of the demand being served. Failure to comply, instantly offers the owner making the request the statutory authority to designate a property surveyor on behalf of the recalcitrant party. This procedure is set out in area 10( 4) of the Act.

Where 2 property surveyors are selected, they are required to agree upon the choice, in composing, of a third property surveyor who might be hired by either of the property surveyors or either of the parties to figure out the contested matters and make the required award. The third surveyor is never selected by anyone but the Act provides the person so selected the very same statutory powers as the two property surveyors.

3rd property surveyors are most typically called upon where the two property surveyors have actually reached an impasse in their considerations over some specific point and frequently this can be in respect on the reasonableness of the fees of the surveyor designated by the adjacent owner. Rarely will a 3rd surveyor be asked to prepare an award in regard of the entire works however might join with one or other of the two surveyors to do so if the requirement emerges.

There is no definition of who can be a property surveyor, however it ought to not be the same individual that will monitor the works.

The award will set out the works that can be carried out, who will pay the costs for the preparation of the award and assessment of the works to ensure that they adhere to the works, and who will pay for the works. They will normally be needed to pay the fees and the expense of the works if the work is exclusively for the advantage of the building owner.

Celebrations have 2 week to interest the county court if they disagree with the award.

The Act enables access to the adjacent residential or commercial property for the purposes of performing the works whether the adjoining owner allows or not, however they need to be offered 14 days notification.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notices and other files can be served by electronic interactions.

The info that Discovers should supply in regard of works covered the above areas is different in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas however the requirements of a Notice relating to Area 2 works is set out in Area 3 of the Act. A valid disagreement can still develop, and surveyors be appointed in accordance with Section 10, in regard of works informed under that section however only as concerns actual dissent on specific grounds. An adjacent owner’s factors for disputing Section 2 and Area 6 works are hardly ever specified prior to the appointment of property surveyors and in many cases not even then.

Where dissent has actually occurred, whether real or deemed, both owners are lawfully required to designate a concurred surveyor or, if they can not jointly concur on a single individual, a surveyor each and if requested to make such a visit by the other party, should do so within 10 days of the demand being served.

Related Articles