We are fully certified specialist Party Wall Surveyors with years of experience producing Schedule of Condition reports and lawfully serving Party Wall Agreements and Notices.

With offices in Central, South and North London it makes us completely put to serve Greater London and the surrounding counties.

Whether you’re a Building Owner preparing a brand-new job or a neighbour who has been served a Party Wall Notification our knowledge and experience guarantees we are always best prepared to assist with your Party Wall requirements.

Call now and talk with a Professional Surveyor for friendly professional recommendations.

Party Wall (WikiPedia)

Generally, the builder lays the wall surface along a property line separating two terraced houses, so that one half of the wall’s density lies on each side. This kind of wall is typically structural. Party wall surfaces can likewise be developed by two abutting walls developed at different times.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an enabling Act, insofar as it gives the owner of a home the legal right to carry out specific works that might otherwise constitute trespass or nuisance.

However, it also looks for to secure the interests of adjoining owners from any possibly negative impacts that such works may have by imposing a requirement that all adjacent owners be offered prior notification of them.

In addition, the Act offers a necessary disagreement resolution treatment mediated by a statutorily appointed property surveyor or property surveyors if neighbouring owners have issues about the execution of any proposition so alerted.

Particularly, such notification should be served where the owner of a residential or commercial property (called ‘the structure owner’) means to carry out any building work described in Sections 1, 2 and 6 of the Act. Keep in mind that it is just those works that are covered by the Act and the scope is limited to the following:

The info that Sees need to supply in regard of works covered the above sections is different in each case. The requirements of Area 1 and Section 6 Notifications are set out in those areas however the requirements of a Notice connecting to Section 2 works is set out in Area 3 of the Act. It is essential to note that the credibility of any notice not offering all the relevant details or served in the incorrect way, could be open up to challenge in Court.

There is no standard type of Notification although many individuals use those released by the RICS or versions added to the explanatory booklet provided by the Department for Communities and City Government. However, provided all the details needed by the relevant area of the Act exists, a basic letter would be similarly valid.

Depending upon the situations of any offered task there might be more than one adjacent owner on whom see needs to be served in respect of the exact same work and, in the case of deep excavations, an Adjacent Owner might be besides an instant neighbour. It is constantly preferable to go over the designated deal with adjacent owners before serving them with official written notice – a proposal well explained might relieve issues adequate to prevent a disagreement arising and prevent the requirement to select surveyors.

There are 2 exceptions where the requirement to serve notice may be prevented:

  1. De minimis works: The government’s explanatory brochure says that some works on a party wall may be so minor that service of notification under the Act would be normally considered as not needed and give as examples works unlikely to impact the structural strength or support functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support shelves, kitchen cupboards, and the like.
  2. Functions under Area 2 of the Act offered that written authorization is gotten from all Adjoining Owners and Occupiers prior to work commences.

The 3 types of Notification are understood, respectively as:

A party structure notice should be served at least 2 months before the date on which it is proposed to begin that work. The other two notifications must be served at least one month prior to work starting.

The necessary information which Sees should include are as follows:

Most of the pro-forma notices in use consist of the following information as a matter of course despite the type of notification:

Section 10 of the Act stipulates that where an adjacent owner does not consent in writing to works notified by the structure owner under Sections 3 and 6, both parties must either settle on the consultation of a single property surveyor to act for both of them (referred to as the Agreed Property Surveyor), or each select their own surveyor, to figure out by award matters in dispute between the celebrations.

Where a task is straightforward, this might only include consideration of the time and manner in which those works are to be performed. In more complex schemes, thought will have to be offered to a commensurately greater number of factors and certainly appointed property surveyors have the statutory jurisdiction to make an award in respect of any matter connected with any work to which the act relates.

The exact same treatment is utilized to deal with any subsequent disputes in between neighbouring owners that might emerge in relation to the notified works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjacent owner does not stop the statutory process. A disagreement can develop by an adjoining owner actively dissenting, that is, communicating to the structure owner an objection in respect of some matter emerging out of or incidental to the works – the means of making that objection are not important, but if he stays quiet, neither consenting nor dissenting for a period of 14 days after having actually been served with a Notification under either Section 3 or Area 6, the Act deems a dissent to have occurred in any event.

There is no deemed dissent arrangement in Section 1 of the Act. A legitimate conflict can still emerge, and property surveyors be appointed in accordance with Section 10, in regard of works notified under that section however just as concerns actual dissent on specific premises. An adjacent owner’s reasons for contesting Area 2 and Area 6 works are seldom specified prior to the appointment of property surveyors and in many cases not even then.

Where dissent has arisen, whether real or deemed, both owners are legally required to select a concurred surveyor or, if they can not jointly agree on a bachelor, a surveyor each and if asked for to make such a visit by the other party, should do so within 10 days of the demand being served. Failure to comply, instantly gives the owner making the demand the statutory authority to select a surveyor on behalf of the recalcitrant party. This treatment is set out in area 10( 4) of the Act.

Where two property surveyors are appointed, they are required to agree upon the selection, in writing, of a 3rd property surveyor who might be called upon by either of the surveyors or either of the parties to identify the challenged matters and make the required award. The 3rd surveyor is never ever selected by anybody however the Act offers the individual so picked the exact same statutory powers as the two property surveyors.

3rd surveyors are most commonly called upon where the two surveyors have actually reached an impasse in their considerations over some specific point and typically this can be in regard on the reasonableness of the fees of the property surveyor designated by the adjoining owner. Rarely will a third property surveyor be asked to draw up an award in regard of the whole works however may join with one or other of the two property surveyors to do so if the need develops.

There is no meaning of who can be a property surveyor, but it must not be the same person that will supervise the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and examination of the works to make sure that they adhere to the works, and who will spend for the works. They will normally be required to pay the fees and the cost of the works if the work is solely for the advantage of the building owner.

If they disagree with the award, parties have 14 days to appeal to the county court.

The Act enables access to the adjacent property for the purposes of performing the works whether the adjacent owner permits or not, however they must be provided 14 days notice.

NB: The introduction of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 means that from 6 April 2016, notifications and other documents can be served by electronic interactions.

The information that Discovers need to provide in regard of works covered the above sections is various in each case. The requirements of Area 1 and Area 6 Notices are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Area 3 of the Act. A valid disagreement can still develop, and property surveyors be appointed in accordance with Section 10, in respect of works notified under that section but only as regards actual dissent on particular grounds. An adjoining owner’s reasons for disputing Section 2 and Area 6 works are hardly ever specified prior to the appointment of property surveyors and in lots of cases not even then.

Where dissent has arisen, whether real or considered, both owners are lawfully required to designate an agreed property surveyor or, if they can not collectively agree on a single individual, a property surveyor each and if requested to make such a visit by the other party, need to do so within 10 days of the request being served.