We are Party Wall Surveyors specialising in party wall concerns in UK. We have more than twenty five years experience of working in UK, acting for experts, services, in addition to for people.

Each quick is distinct, and our devoted group of party wall property surveyors is experienced in dealing with all manner of issues relating to party walls. We are proud to provide a bespoke service to match the differing needs of our clients.

This site is created to provide standard information along with providing you the chance to contact us straight with your issues and requirements, thus enabling our specialist Party Wall Surveyors to advise you appropriately.

The current legislation dealing with party walls and associated matters is the Party Wall etc. Act 1996, which governs the rights and commitments of those proposing work to party walls/structures, and/or underpinning thereof, nearby excavations and/or foundations (consisting of stacked foundations).

Our team of Faulkners Surveyors Party Wall Surveyors offers a distinct specific niche service, which allows you to have the very best quality service at competitively priced charges.

For more details contact among our Faulkners Surveyors Party Wall property surveyors on 03300100262.

Party Wall (WikiPedia)

Commonly, the building contractor lays the wall surface along a residential or commercial property line separating 2 terraced homes, so that one half of the wall’s density lies on each side. This kind of wall is normally architectural. Party wall surfaces can also be created by 2 abutting walls constructed at different times.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an enabling Act, insofar as it approves the owner of a property the legal right to carry out certain works that may otherwise make up trespass or annoyance.

It likewise looks for to secure the interests of adjacent owners from any possibly negative effects that such works might have by imposing a requirement that all adjacent owners be provided prior notification of them.

In addition, the Act attends to a mandatory conflict resolution treatment moderated by a statutorily designated property surveyor or surveyors if neighbouring owners have issues about the application of any proposal so informed.

Specifically, such notification needs to be served where the owner of a property (referred to as ‘the structure owner’) means to carry out any construction work described in Sections 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is limited to the following:

The details that Notices need to provide in respect of works covered the above areas is various in each case. The requirements of Area 1 and Section 6 Notices are set out in those areas but the requirements of a Notice relating to Area 2 works is set out in Area 3 of the Act. It is necessary to keep in mind that the credibility of any notice not supplying all the pertinent info or served in the incorrect way, could be available to challenge in Court.

There is no standard kind of Notification although many people utilize those published by the RICS or versions added to the explanatory pamphlet provided by the Department for Communities and Local Government. Offered all the information needed by the pertinent section of the Act is present, a basic letter would be equally valid.

Depending upon the circumstances of any provided job there may be more than one adjoining owner on whom notice requirements to be served in regard of the exact same work and, in the case of deep excavations, an Adjoining Owner might be aside from an instant neighbour. It is constantly preferable to go over the designated works with adjacent owners prior to serving them with formal composed notification – a proposition well described might reduce concerns sufficient to prevent a conflict emerging and prevent the requirement to designate surveyors.

There are 2 exceptions where the requirement to serve notice might be prevented:

  1. De minimis works: The federal government’s explanatory pamphlet says that some works on a party wall may be so minor that service of notification under the Act would be typically considered not essential and give as examples works unlikely to affect the structural strength or assistance functions of a party structure or cause damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical wiring or inserting power sockets, and screws to support racks, kitchen cabinets, and so on.
  2. Works under Area 2 of the Act provided that written permission is acquired from all Adjoining Owners and Occupiers prior to work commences.

The three kinds of Notice are known, respectively as:

A party structure notification should be served at least two months prior to the date on which it is proposed to begin that work. The other two notices need to be served at least one month prior to work starting.

The necessary info which Observes must consist of are as follows:

Most of the pro-forma notices in use consist of the following information as a matter of course regardless of the kind of notification:

Section 10 of the Act states that where an adjoining owner does not permission in writing to works notified by the building owner under Areas 3 and 6, both parties must either agree on the consultation of a single surveyor to act for both of them (called the Agreed Surveyor), or each select their own surveyor, to figure out by award matters in dispute between the celebrations.

Where a job is straightforward, this might just involve consideration of the time and way in which those works are to be carried out. In more complex plans, believed will need to be offered to a commensurately greater number of factors and certainly designated property surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The very same treatment is used to solve any subsequent disputes between neighbouring owners that might emerge in relation to the alerted works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inactiveness on the part of the adjacent owner does not stop the statutory procedure. A conflict can emerge by an adjoining owner actively dissenting, that is, interacting to the structure owner an objection in respect of some matter occurring out of or incidental to the works – the means of making that objection are not important, but if he remains quiet, neither consenting nor dissenting for a duration of 2 week after having actually been served with a Notification under either Area 3 or Section 6, the Act considers a dissent to have actually emerged in any event.

There is no considered dissent arrangement in Area 1 of the Act. A valid disagreement can still occur, and property surveyors be designated in accordance with Area 10, in respect of works alerted under that section however just as relates to actual dissent on specific premises. An adjacent owner’s factors for challenging Area 2 and Section 6 works are hardly ever specified prior to the appointment of property surveyors and oftentimes not even then.

Where dissent has arisen, whether actual or deemed, both owners are legally required to select a concurred surveyor or, if they can not jointly settle on a bachelor, a property surveyor each and if asked for to make such a consultation by the other party, should do so within 10 days of the demand being served. Failure to comply, automatically offers the owner making the request the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where two surveyors are appointed, they are required to agree upon the choice, in writing, of a third property surveyor who might be called upon by either of the surveyors or either of the parties to determine the disputed matters and make the necessary award. The third surveyor is never appointed by anyone but the Act provides the person so chose the same statutory powers as the two property surveyors.

Third surveyors are most frequently called upon where the two surveyors have reached a deadlock in their considerations over some particular point and typically this can be in respect on the reasonableness of the charges of the property surveyor selected by the adjacent owner. Hardly ever will a 3rd surveyor be asked to draw up an award in respect of the entire works but might join with one or other of the two property surveyors to do so if the need emerges.

There is no definition of who can be a surveyor, but it should not be the same individual that will monitor the works.

The award will set out the works that can be performed, who will pay the charges for the preparation of the award and examination of the works to ensure that they adhere to the works, and who will pay for the works. They will generally be required to pay the fees and the cost of the works if the work is entirely for the benefit of the structure owner.

Celebrations have 2 week to appeal to the county court if they disagree with the award.

The Act allows access to the adjacent residential or commercial property for the purposes of performing the works whether the adjacent owner allows or not, however they should be offered 14 days notification.

NB: The intro of The Party Wall etc. Act 1996 (Electronic Communications) Order 2016 indicates that from 6 April 2016, notices and other files can be served by electronic interactions.

The details that Observes should offer in regard of works covered the above areas is different in each case. The requirements of Area 1 and Area 6 Notifications are set out in those sections however the requirements of a Notice relating to Section 2 works is set out in Area 3 of the Act. A legitimate dispute can still develop, and surveyors be designated in accordance with Area 10, in regard of works informed under that section but just as relates to actual dissent on specific premises. An adjoining owner’s reasons for disputing Area 2 and Area 6 works are rarely defined prior to the visit of property surveyors and in lots of cases not even then.

Where dissent has emerged, whether actual or deemed, both owners are lawfully required to select a concurred property surveyor or, if they can not collectively concur on a single person, a property surveyor each and if requested to make such a visit by the other party, should do so within 10 days of the request being served.