Faulkners Surveyors offer a series of building surveying services specialising in Party Wall Services.
We pride ourselves on our versatility and personal participation towards our clients requirements. Faulkners Surveyors are an expanding group of property surveyors with a wealth of ability, knowledge and experience. Then call Faulkners Surveyors for a helpful chat, if you are looking for a professional yet flexible method to all your residential or commercial property matters.
Our surveyors are managed by the Professors of Party Wall Surveyors and bring expert indemnity insurance coverage to cover their work.
Party Wall (WikiPedia)
Party Wall Act
The Party Wall and so on. Act 1996 is an allowing Act, insofar as it gives the owner of a home the legal right to undertake specific works that may otherwise make up trespass or problem.
Nevertheless, it likewise seeks to safeguard the interests of adjoining owners from any potentially unfavorable effects that such works might have by enforcing a requirement that all adjoining owners be offered prior notification of them.
In addition, the Act attends to a compulsory dispute resolution treatment mediated by a statutorily appointed property surveyor or property surveyors if neighbouring owners have issues about the application of any proposition so informed.
Specifically, such notice should be served where the owner of a property (known as ‘the structure owner’) plans to carry out any construction work described in Areas 1, 2 and 6 of the Act. Keep in mind that it is only those works that are covered by the Act and the scope is restricted to the following:
- Section 1 applies where it is proposed to erect a new wall at a border that is not already built on.
- Section 2 issues existing party structures, which include party partitions, floors and walls (that separate buildings or parts of structures), party fence walls (essentially a limit wall in between lands in separate ownership which is developed astride a limit) and, in some circumstances, a neighbour’s independent residential or commercial property.
- Area 6 can apply to excavations approximately 6 m far from a structure or structure on neighbouring land, subject to depth criteria which the Act sets out.
The info that Discovers must provide in respect of works covered the above areas is various in each case. The requirements of Section 1 and Section 6 Notifications are set out in those areas but the requirements of a Notification associating with Area 2 works is set out in Area 3 of the Act. It is essential to keep in mind that the credibility of any notice not providing all the appropriate info or served in the incorrect manner, could be available to challenge in Court.
There is no standard type of Notice although many people use those published by the RICS or versions added to the explanatory booklet issued by the Department for Communities and City Government. Provided all the details required by the relevant area of the Act is present, an easy letter would be similarly valid.
Depending on the situations of any provided task there may be more than one adjoining owner on whom discover needs to be served in respect of the same work and, in the case of deep excavations, an Adjacent Owner may be aside from an instant neighbour. It is always more suitable to discuss the desired works with adjacent owners before serving them with formal written notification – a proposal well discussed might reduce concerns sufficient to prevent a disagreement occurring and avoid the necessity to designate surveyors.
There are two exceptions where the requirement to serve notice may be prevented:
- De minimis works: The government’s explanatory brochure states that some deal with a party wall may be so minor that service of notification under the Act would be generally considered as not essential and give as examples works unlikely to impact the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or placing power sockets, and screws to support racks, kitchen area cupboards, and the like.
- Functions under Area 2 of the Act supplied that written permission is acquired from all Adjacent Owners and Occupiers prior to work commences.
The three types of Notification are understood, respectively as:
- Section 1: Line of Junction Notice
- Area 3 (for S2 works): Party Structure Notice
- Section 6: Notification of Adjacent Excavation
A party structure notice need to be served a minimum of 2 months before the date on which it is proposed to start that work. The other two notifications need to be served a minimum of one month prior to work commencing.
The obligatory information which Notices must contain are as follows:
- Line of Junction Notice:
- An indication of the building owner’s desire to construct a wall.
- A description of the wall.
- Party Structure Notice:
- The name and address of the building owner.
- The nature and particulars of the proposed work.
- The date on which the proposed work will begin.
- Notice of Adjacent Excavation:
- An indication of the building owner’s propositions.
- A statement regarding whether the building owner proposes to underpin or otherwise enhance or safeguard the structures of the structure or structure of the adjacent owner.
- Accompanying plans and sections revealing: a) the website and depth of any excavation the structure owner proposes to make; b) if he proposes to put up a structure or structure, its site.
The majority of the pro-forma notifications in use consist of the following details as a matter of course no matter the type of notice:
- The date of the notification.
- If different), the name and addresses of both the structure and adjoining owners (and the addresses of the residential or commercial properties being worked on/affected.
- A statement as to the beginning of works relative to the appropriate notice duration.
- An advisory note discussing what happens if the recipient actively dissents from the works or stops working to respond within 14 days.
Area 10 of the Act states that where an adjoining owner does not permission in writing to works notified by the building owner under Sections 3 and 6, both parties need to either agree on the visit of a single surveyor to act for both of them (called the Agreed Surveyor), or each appoint their own surveyor, to identify by award matters in dispute in between the celebrations.
Where a project is straightforward, this may only involve factor to consider of the time and manner in which those works are to be carried out. In more complex plans, thought will need to be offered to a commensurately greater number of aspects and indeed appointed property surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.
The same procedure is used to solve any subsequent conflicts in between neighbouring owners that may occur in relation to the informed works, consisting of any loss or damage suffered by an adjoining owner as a result of their execution.
Inactiveness on the part of the adjoining owner does not stop the statutory procedure. A dispute can arise by an adjacent owner actively dissenting, that is, communicating to the building owner an objection in respect of some matter arising out of or incidental to the works – the ways of making that objection are not important, however if he remains silent, neither dissenting nor consenting for a period of 2 week after having actually been served with a Notice under either Area 3 or Section 6, the Act deems a dissent to have arisen in any event.
There is no deemed dissent arrangement in Area 1 of the Act. A valid dispute can still emerge, and surveyors be selected in accordance with Section 10, in respect of works notified under that area however only as regards actual dissent on particular premises. An adjoining owner’s factors for contesting Section 2 and Section 6 works are seldom defined prior to the visit of property surveyors and in many cases not even then.
Where dissent has occurred, whether actual or deemed, both owners are legally obliged to appoint a concurred property surveyor or, if they can not jointly agree on a bachelor, a surveyor each and if requested to make such an appointment by the other party, need to do so within 10 days of the demand being served. Failure to comply, automatically provides the owner making the request the statutory authority to designate a surveyor on behalf of the recalcitrant party. This treatment is set out in area 10( 4) of the Act.
Where two surveyors are selected, they are obliged to agree upon the choice, in composing, of a 3rd property surveyor who might be hired by either of the property surveyors or either of the parties to figure out the disputed matters and make the needed award. The third surveyor is never ever selected by anyone however the Act gives the individual so chose the exact same statutory powers as the two property surveyors.
3rd surveyors are most commonly called upon where the two property surveyors have reached a deadlock in their deliberations over some particular point and frequently this can be in regard on the reasonableness of the charges of the surveyor appointed by the adjoining owner. Rarely will a third property surveyor be asked to prepare an award in regard of the entire works but might join with one or other of the two property surveyors to do so if the need occurs.
There is no meaning of who can be a property surveyor, however it needs to not be the same person that will supervise the works.
The award will set out the works that can be carried out, who will pay the costs for the preparation of the award and assessment of the works to guarantee that they abide by the works, and who will spend for the works. They will typically be required to pay the costs and the cost of the works if the work is exclusively for the advantage of the building owner.
If they disagree with the award, celebrations have 14 days to appeal to the county court.
The Act allows access to the adjacent home for the purposes of performing the works whether the adjoining owner gives permission or not, nevertheless they must be given 2 week notice.
NB: The intro of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 indicates that from 6 April 2016, notices and other documents can be served by electronic communications.
The information that Notices must provide in regard of works covered the above sections is various in each case. The requirements of Section 1 and Section 6 Notices are set out in those areas but the requirements of a Notification relating to Area 2 works is set out in Section 3 of the Act. A legitimate dispute can still arise, and surveyors be appointed in accordance with Area 10, in regard of works informed under that area however only as concerns actual dissent on particular grounds. An adjacent owner’s factors for challenging Area 2 and Section 6 works are rarely specified prior to the visit of property surveyors and in many cases not even then.
Where dissent has emerged, whether actual or deemed, both owners are legally obliged to designate an agreed property surveyor or, if they can not jointly agree on a single person, a property surveyor each and if asked for to make such a consultation by the other party, must do so within 10 days of the demand being served.