We pride ourselves on our versatility and individual involvement towards our clients requirements. Faulkners Surveyors are an expanding team of property surveyors with a wealth of know-how, experience and skill. If you are trying to find an expert yet versatile method to all your property matters then call Faulkners Surveyors for a helpful chat.

Our surveyors are managed by the Faculty of Party Wall Surveyors and carry professional indemnity insurance to cover their work.

Party Wall (WikiPedia)

A party wall (occasionally parti-wall or parting wall, also known as common wall or as a demising wall) is a dividing partition between two adjoining buildings that is shared by the occupants of each residence or business. Typically, the builder lays the wall along a property line dividing two terraced houses, so that one half of the wall’s thickness lies on each side. This type of wall is usually structural. Party walls can also be formed by two abutting walls built at different times. The term can be also used to describe a division between separate units within a multi-unit apartment complex. Very often the wall in this case is non-structural but designed to meet established criteria for sound and/or fire protection, i.e. a firewall.

wall party

Party Wall Act

The Party Wall etc. Act 1996 is an allowing Act, insofar as it grants the owner of a home the legal right to undertake specific works that might otherwise constitute trespass or problem.

However, it also looks for to safeguard the interests of adjoining owners from any potentially unfavorable effects that such works might have by enforcing a requirement that all adjoining owners be provided prior notice of them.

In addition, the Act attends to a mandatory disagreement resolution procedure mediated by a statutorily selected property surveyor or surveyors if neighbouring owners have concerns about the application of any proposition so alerted.

Particularly, such notice should be served where the owner of a property (called ‘the structure owner’) plans to undertake any construction work explained in Areas 1, 2 and 6 of the Act. Note that it is just those works that are covered by the Act and the scope is restricted to the following:

The details that Observes should offer in regard of works covered the above sections is different in each case. The requirements of Section 1 and Section 6 Notifications are set out in those sections however the requirements of a Notification connecting to Area 2 works is set out in Area 3 of the Act. It is very important to note that the credibility of any notification not supplying all the pertinent details or served in the inaccurate way, could be available to challenge in Court.

There is no standard type of Notification although lots of people use those released by the RICS or variations appended to the explanatory booklet provided by the Department for Communities and City Government. Offered all the details required by the pertinent area of the Act is present, a basic letter would be equally legitimate.

Depending upon the situations of any provided project there may be more than one adjacent owner on whom notice requirements to be served in regard of the exact same work and, when it comes to deep excavations, an Adjacent Owner may be besides an immediate neighbour. It is constantly preferable to go over the designated works with adjoining owners before serving them with official written notification – a proposition well discussed may relieve issues enough to prevent a dispute emerging and avoid the requirement to appoint surveyors.

There are two exceptions where the requirement to serve notice may be avoided:

  1. De minimis works: The government’s explanatory brochure states that some works on a party wall may be so minor that service of notice under the Act would be normally considered not needed and give as examples works unlikely to impact the structural strength or support functions of a party structure or trigger damage to the neighbours side of it, such as re-plastering, shallow chasing for electrical circuitry or inserting power sockets, and screws to support racks, kitchen cupboards, and the like.
  2. Functions under Area 2 of the Act supplied that composed authorization is acquired from all Adjacent Owners and Occupiers before work commences.

The 3 kinds of Notification are understood, respectively as:

A party structure notification should be served at least two months prior to the date on which it is proposed to start that work. The other 2 notices need to be served at least one month prior to work starting.

The obligatory info which Notices should contain are as follows:

The majority of the pro-forma notices in use consist of the following information as a matter of course regardless of the kind of notification:

Section 10 of the Act specifies that where an adjoining owner does not consent in writing to works notified by the building owner under Areas 3 and 6, both celebrations must either agree on the consultation of a single surveyor to act for both of them (referred to as the Agreed Surveyor), or each designate their own surveyor, to determine by award matters in dispute between the celebrations.

Where a project is straightforward, this might only involve consideration of the time and manner in which those works are to be performed. In more complex schemes, thought will need to be offered to a commensurately greater number of aspects and indeed selected property surveyors have the statutory jurisdiction to make an award in respect of any matter gotten in touch with any work to which the act relates.

The very same treatment is utilized to resolve any subsequent disagreements between neighbouring owners that may arise in relation to the informed works, including any loss or damage suffered by an adjacent owner as a result of their execution.

Inaction on the part of the adjacent owner does not halt the statutory procedure. A conflict can develop by an adjoining owner actively dissenting, that is, communicating to the structure owner an objection in respect of some matter developing out of or incidental to the works – the ways of making that objection are not important, however if he stays quiet, neither dissenting nor consenting for a period of 14 days after having been served with a Notice under either Area 3 or Area 6, the Act deems a dissent to have actually occurred in any event.

There is no considered dissent provision in Section 1 of the Act. A valid conflict can still occur, and property surveyors be designated in accordance with Area 10, in regard of works notified under that area however just as regards real dissent on specific premises. An adjoining owner’s factors for challenging Section 2 and Area 6 works are rarely specified prior to the visit of property surveyors and in most cases not even then.

Where dissent has actually occurred, whether real or considered, both owners are lawfully required to designate an agreed surveyor or, if they can not collectively agree on a bachelor, a property surveyor each and if requested to make such a consultation by the other party, need to do so within 10 days of the demand being served. Failure to comply, automatically offers the owner making the demand the statutory authority to select a property surveyor on behalf of the recalcitrant party. This treatment is set out in section 10( 4) of the Act.

Where 2 surveyors are designated, they are required to agree upon the selection, in writing, of a 3rd surveyor who might be hired by either of the surveyors or either of the parties to figure out the challenged matters and make the necessary award. The 3rd property surveyor is never appointed by anybody however the Act gives the person so chose the very same statutory powers as the two property surveyors.

3rd property surveyors are most typically called upon where the two property surveyors have reached a deadlock in their deliberations over some particular point and often this can be in regard on the reasonableness of the fees of the surveyor designated by the adjacent owner. Rarely will a 3rd surveyor be asked to prepare an award in respect of the entire works however might join with one or other of the two surveyors to do so if the requirement occurs.

There is no definition of who can be a surveyor, however it needs to not be the same individual that will supervise the works.

The award will set out the works that can be carried out, who will pay the costs for the preparation of the award and examination of the works to guarantee that they adhere to the works, and who will pay for the works. If the work is solely for the advantage of the structure owner, then they will generally be required to pay the charges and the cost of the works.

If they disagree with the award, celebrations have 14 days to appeal to the county court.

The Act allows access to the adjoining home for the functions of carrying out the works whether the adjoining owner permits or not, nevertheless they should be given 2 week notification.

NB: The introduction of The Party Wall and so on. Act 1996 (Electronic Communications) Order 2016 suggests that from 6 April 2016, notices and other files can be served by electronic interactions.

The information that Sees must supply in respect of works covered the above areas is different in each case. The requirements of Section 1 and Section 6 Notices are set out in those sections however the requirements of a Notice relating to Area 2 works is set out in Section 3 of the Act. A valid dispute can still develop, and property surveyors be appointed in accordance with Area 10, in respect of works alerted under that section however just as relates to real dissent on particular grounds. An adjacent owner’s factors for challenging Section 2 and Section 6 works are hardly ever specified prior to the visit of property surveyors and in numerous cases not even then.

Where dissent has arisen, whether actual or considered, both owners are legally obliged to designate an agreed surveyor or, if they can not collectively agree on a single person, a property surveyor each and if requested to make such a consultation by the other party, need to do so within 10 days of the demand being served.